Legislation Details

File #: 2025-01100    Version: 1
Type: Consent Item Status: Passed
File created: 5/8/2025 In control: City Council - 5PM
On agenda: 6/10/2025 Final action: 6/10/2025
Title: Agreement: Engineering Services for the Sump 107 Rehabilitation Project
Title
Agreement: Engineering Services for the Sump 107 Rehabilitation Project
End

FileID
File ID: 2025-01100
End

Location
Location: District 4
End

Recommendation
Recommendation: Pass a Motion authorizing the Interim City Manager or designee to execute a Professional Services Agreement with Brown and Caldwell to provide engineering design and project coordination services for the Sump 107 Rehabilitation Project (X14170500, Fund 6006 and Fund 6021), for an amount not-to-exceed $649,928.
End

Contact
Contact: Kyle Beltran, Project Manager, (916) 808-3828, kbeltran1@cityofsacramento.org;
Roxanne Dilley, Supervising Engineer, (916) 808-1458, rdilley@cityofsacramento.org;
Sherill Huun, Interim Director, (916) 808-1455, shuun@cityofsacramento.org; Department of Utilities
End

Presenter
Presenter: None
End

Attachments
Attachments:
1-Description/Analysis
2-Agreement
End

Description/Analysis
IssueDetail
Issue Detail: Staff recommends Council approve an agreement with Brown and Caldwell for the engineering design and project coordination services for the Sump 107 Rehabilitation Project. This project has been identified as a high priority project by the Department of Utilities (DOU), through a business case evaluation performed in 2022 by Brown and Caldwell, which analyzed multiple alternatives to improve the pump station's reliability and performance, while also considering accessibility, maintenance, construction risks, consequence of failure, and alignment with the City's goals. Services for this contract include, but are not limited to, preliminary and final design engineering; construction document preparation; and bidding and construction support.

Sump 107 is a critical part of the Combined Sewer System (CSS) and receives both wastewater and drainage flows from Sacramento's Old Town area and the adjacent Embassy Suites. Sump 107 was initially constructed in 1967 and was later upgraded in 1990, coinciding with the construction of the ...

Click here for full text