Legislation Details

File #: 2026-00600    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 2/11/2026 In control: City Council - 2PM
On agenda: 3/24/2026 Final action:
Title: Establish Capital Improvement Project and Budgetary Adjustments: Hollow Sidewalk Repair Project (T15265400)
Code sections: 12.32 - Sidewalk Repair, Maintenance and Liability
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Establish Capital Improvement Project and Budgetary Adjustments: Hollow Sidewalk Repair Project (T15265400)
End

FileID
File ID: 2026-00600
End

Location
Location: District 4
End

Recommendation
Recommendation: Adopt a Resolution: 1) establishing the Hollow Sidewalk Repair Project (T15265400) as a new Capital Improvement Project; and 2) authorizing the City Manager or designee to increase the expenditure budget of the Hollow Sidewalk Repair Project (T15265400) by transferring $1,200,000 (Gas Tax, Fund 2002) from the available fund balance.
End

Contact
Contact: Kelli Lacy, Assistant Civil Engineer, (916) 808-8157, kelacy@cityofsacramento.org; Judith Matsui-Drury, Supervising Engineer, (916) 808-7610, jmatsui-drury@cityofsacramento.org; Ofelia Avalos, Engineering Manager, (916) 808-5054, oavalos@cityofsacramento.org; Department of Public Works
End

Presenter
Presenter: None
End

Attachments
Attachments:
1-Description/Analysis
2-Resolution
End

Description/Analysis
IssueDetail
Issue Detail: In the 1860's, a portion of the City was raised in response to flooding that was occurring in some riverfront areas downtown. The roads were raised with backfill, second floors of existing buildings became the first floors, and the new sidewalks were constructed on structural support systems, leaving a basement level. This action created hollow sidewalks.

For the limited number of remaining properties that still have hollow sidewalks in the downtown area, the City has the Hollow Sidewalk Monitoring Program to monitor and inspect sites and notify applicable property owners to repair the hollow sidewalk properties. These properties are generally bounded by Front Street to 12th Street and I Street to L Street.

The Hollow Sidewalk Monitoring Program does not include scope or funding for repairs. Sidewalk repairs are the responsibility of property owners. For the City to initiate repairs, which includes engineering and construction of hollow side...

Click here for full text