Legislation Details

File #: 2026-00940    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 4/16/2026 In control: City Council - 2PM
On agenda: 5/26/2026 Final action:
Title: [Contract] Facility Chemical Containment Coating Project
Attachments: 1. 2026-00940 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
[Contract] Facility Chemical Containment Coating Project
End

FileID
File ID: 2026-00940
End

Location
Location: District 4, 5, 6, and 7
End

Recommendation
Recommendation: Pass a Motion: 1) approving the contract plans and specifications for the Facility Chemical Containment Coating project (X14170500[SX1][RN2]); [TB3]2) awarding the contract to Mason Painting, Inc. for an amount not to exceed $371,000; and 3) authorizing the City Manager or designee to execute the construction contract with Mason Painting, Inc.
End

Contact
Contact: Roxanne Dilley, Supervising Engineer, (916) 808-1458, rdilley@cityofsacramento.org; Sherill Huun, Engineering & Water Resources Division Manager, (916) 808-1455, shuun@cityofsacramento.org; Dalia Fadl, Director, (916) 808-3765, dfadl@cityofsacramento.org; Department of Utilities
End

Presenter
Presenter: None
End

Attachments
Attachments:
1-Description/Analysis
2-Contract
End

Description/Analysis
IssueDetail
Issue Detail: Staff recommends City Council award a construction contract to Mason Painting, Inc. to rehabilitate and recoat the chemical containment areas around the Sodium Bisulfite and Sodium Hypochlorite tanks at the locations listed below that are used for the treatment of the combined wastewater system.

* Combined Wastewater Treatment Plant (CWTP) at 1391 35th Avenue
* Pioneer Reservoir at 2100 Front Street

This project will also include, but is not limited to, concrete restoration, surface preparation, and coating application.

These containment areas were identified as high priorities by the City's Wastewater Operations and Maintenance (O&M) staff and require repairs due to age, deterioration, and poor structural integrity. The existing coatings are failing with severe cracking and peeling, contributing to further deterioration of the concrete and its structural integrity. This project will extend the useful life of the concrete containment areas and improve their functionality and ...

Click here for full text