[Contract] Facility Chemical Containment Coating Project
End
FileID
File ID: 2026-00940
End
Location
Location: District 4, 5, 6, and 7
End
Recommendation
Recommendation: Pass a Motion: 1) approving the contract plans and specifications for the Facility Chemical Containment Coating project (X14170500[SX1][RN2]); [TB3]2) awarding the contract to Mason Painting, Inc. for an amount not to exceed $371,000; and 3) authorizing the City Manager or designee to execute the construction contract with Mason Painting, Inc.
End
Contact
Contact: Roxanne Dilley, Supervising Engineer, (916) 808-1458, rdilley@cityofsacramento.org; Sherill Huun, Engineering & Water Resources Division Manager, (916) 808-1455, shuun@cityofsacramento.org; Dalia Fadl, Director, (916) 808-3765, dfadl@cityofsacramento.org; Department of Utilities
End
Presenter
Presenter: None
End
Attachments
Attachments:
1-Description/Analysis
2-Contract
End
Description/Analysis
IssueDetail
Issue Detail: Staff recommends City Council award a construction contract to Mason Painting, Inc. to rehabilitate and recoat the chemical containment areas around the Sodium Bisulfite and Sodium Hypochlorite tanks at the locations listed below that are used for the treatment of the combined wastewater system.
* Combined Wastewater Treatment Plant (CWTP) at 1391 35th Avenue
* Pioneer Reservoir at 2100 Front Street
This project will also include, but is not limited to, concrete restoration, surface preparation, and coating application.
These containment areas were identified as high priorities by the City's Wastewater Operations and Maintenance (O&M) staff and require repairs due to age, deterioration, and poor structural integrity. The existing coatings are failing with severe cracking and peeling, contributing to further deterioration of the concrete and its structural integrity. This project will extend the useful life of the concrete containment areas and improve their functionality and ...