Legislation Details

File #: 2026-01573    Version: 1
Type: Discussion Item Status: Agenda Ready
File created: 8/17/2026 In control: Disabilities Advisory Commission
On agenda: 9/2/2026 Final action:
Title: Fruitridge Road Improvements Project (T15036300)
Attachments: 1. 2026-01573 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Fruitridge Road Improvements Project (T15036300)
End

FileID
File ID: 2026-01573
End

Location
Location: Phase 1: Fruitridge Road between 65th Street Expressway and Power Inn Road; Phase 2: Fruitridge Road between 65th Street Expressway and Stockton Boulevard, District 6
End

Recommendation
Recommendation: Review and comment.
End

Contact
Contact: Stephanie Saiz, Assistant Civil Engineer, (916) 808-6808, ssaiz@cityofsacramento.org, Department of Public Works 
End

Presenter
Presenter: Stephanie Saiz, Assistant Civil Engineer, (916) 808-6808, ssaiz@cityofsacramento.org, Department of Public Works 
End

Attachments
Attachments:
1-Description/Analysis
2-Phase 1 Plans
3-Phase 2 Plans
4-Presentation
End

Description/Analysis
IssueDetail
Issue Detail: The Fruitridge Road Improvements Project is divided into two phases to provide flexibility in funding and project delivery. Phase 1 extends along Fruitridge Road between 65th Street Expressway and Power Inn Road. Phase 2 extends between Stockton Boulevard and 65th Street Expressway.

The project is intended to improve safety and mobility for all users, provide more comfortable and connected pedestrian and bicycle facilities, and rehabilitate deteriorated pavement along the corridor. Fruitridge Road currently carries approximately 21,000 vehicles per day and generally consists of four vehicle travel lanes. The corridor serves surrounding neighborhoods, schools, businesses, transit users, pedestrians, and bicyclists.

Existing bicycle facilities along Fruitridge Road are incomplete and consist primarily of disconnected segments of Class II bicycle lanes. Where bicycle lanes are present, both the bicycle lanes and adjacent vehicle travel lanes are narrow and do not meet the City's current minimum design standards.

Safety is also a significant consideration. Earl Warren Elementary School is located adjacent to the project corridor and was evaluated as part of the City's Vision Zero Top 20 Sc...

Click here for full text