Title
Franklin Boulevard Complete Streets Phase 3 Project (T15250000)
End
FileID
File ID: 2026-01574
End
Location
Location: Franklin Boulevard from 41st Avenue to Fruitridge Road
End
Recommendation
Recommendation: Review and comment.
End
Contact
Contact: Kelli Lacy, Assistant Civil Engineer, (916) 808-8157, kelacy@cityofsacramento.org; Matthew Johns, Supervising Engineer, (916) 808-5760, mjohns@cityofsacramento.org;
Ofelia Avalos, Engineering Services Division Manager, (916) 808-5054, OAvalos@cityofsacramento.org; Department of Public Works
End
Presenter
Presenter: Kelli Lacy, Assistant Civil Engineer, (916) 808-8157, kelacy@cityofsacramento.org; Department of Public Works
End
Attachments
Attachments:
1-Description/Analysis
2-Presentation
End
Description/Analysis
IssueDetail
Issue Detail: The Franklin Boulevard Complete Street Plan was separated into three phases of project segments for implementation: Segment 1, between Sutterville Road/12th Avenue and 19th Avenue, and Segment 2, between 19th Avenue and 32nd Avenue, were combined and constructed as part of the Franklin Boulevard Complete Street Project (T15165500). Segment 3, between 32nd Avenue and Fruitridge Road, is being delivered separately as the Franklin Boulevard Complete Street Phase 3 Project. The Franklin Boulevard Complete Street Project (Phases 1 & 2) has completed construction this year.
The Franklin Boulevard Complete Street Phase 3 project is the final segment to transform Franklin Boulevard into a street that equitably serves all modes of transportation within the South City Farms and North City Farms Neighborhoods. Within project limits, Franklin Boulevard is a four-lane, north-south arterial corridor with a center left turn lane, long pedestrian crossings and no bicycle lanes. The existing sidewalks have no landscaping or City street trees.
This Project will install new sidewalk, pedestrian-scale lighting, ADA compliant curb ramps, signal improvements, an...
Click here for full text