Franklin Boulevard Complete Street Phase 3 Project (T15255600)
End
FileID
File ID: 2026-01718
End
Location
Location: Franklin Boulevard from 38th Avenue to Fruitridge Road
End
Recommendation
Recommendation: Discuss and provide feedback.
End
Contact
Contact: Kelli Lacy, Assistant Civil Engineer, (916) 808-8157, kelacy@cityofsacramento.org; Matthew Johns, Supervising Engineer, (916) 808-5760, mjohns@cityofsacramento.org; Ofelia Avalos, Engineering Services Division Manager, (916) 808-5054, OAvalos@cityofsacramento.org; Department of Public Works
End
Presenter
Presenter: Kelli Lacy, Assistant Civil Engineer, (916) 808-8157, kelacy@cityofsacramento.org, Department of Public Works
End
Attachments
Attachments:
1-Description/Analysis
2-Presentation
3-Draft 60% Design Project Plans
End
Additional Description/Analysis
IssueDetail
Issue Detail:
In February 2020, the City Council accepted the Franklin Boulevard Complete Street Plan as the City’s guide for the reconfiguration of Franklin Boulevard between Sutterville Road and the city/county limits near 38th Avenue. The Franklin Boulevard Complete Street Project will transform the roadway into an active transportation corridor that serves all modes of transportation.
The Franklin Boulevard Complete Street Plan was separated into three phases of project segments for implementation:
Segment 1 - between Sutterville Road/12th Avenue and 19th Avenue
Segment 2 - between 19th Avenue and 32nd Avenue
Segment 3 - between 32nd Avenue and 38th Avenue
Segments 1 and 2 were combined and constructed as a part of the Franklin Boulevard Complete Street Project (T15165500). The Franklin Boulevard Complete Street Project completed construction this year. Segment 3 is being delivered separately as the Franklin Boulevard Complete Street Phase 3 Project (T15255600).
Extensive outreach was performed for all three phases of the Franklin Boulevard Complete Street Projects. The community members and b...