Title
[Contract Amendment] Change Order: Pioneer Structural Repairs
End
FileID
File ID: 2026-01951
End
Location
Location: Citywide
End
Recommendation
Recommendation: Pass a Motion: 1) authorizing the City Manager or designee to execute Change Order No. 4 to City Agreement No. 2025-0803 with NMI Industrial Holdings, LLC, for an amount not to exceed $126,078, bringing the agreement’s total not-to-exceed amount to $1,690,799; and 2) resetting the City Manager or designee’s authority to issue Change Orders for the Agreement.
End
Contact
Contact: Tim Moresco, Project Manager (916) 808-1432, tmoresco@cityofsacramento.org; Michelle Carrey, Engineering & Water Resources Division Manager, (916) 808-1438, mcarrey@cityofsacramento.org; Dalia Fadl, Director, (916) 808-3765, dfadl@cityofsacramento.org; Department of Utilities
End
Presenter
Presenter: None
End
Attachments
Attachments:
1-Description/Analysis
2-Change Order
End
Description/Analysis
IssueDetail
Issue Detail: Staff recommend City Council approve Change Order No. 4 to City Agreement No. 2025-0803 with NMI Industrial Holdings, LLC to cover additional costs associated with the increase in concrete repair at Pioneer Reservoir due to the need to address the spalled concrete. The project plans identified several locations that needed concrete spalling repair on the exterior of the structure, and as the repairs were being performed, a much larger concrete spalling area was identified that required a large increase in square footage to the repair. The additional deterioration was not incorporated into the original project scope, because it was not visible during the inspections and condition assessments completed during the planning and design phases of the project.
End
PolicyConsiderations
Policy Considerations: This Change Order exceeds the City Manager’s approval authority and requires Council approval per City Code 3.04.020.
End
EconomicImpacts
Economic Impacts: This C...