Legislation Details

File #: 2026-02014    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 11/3/2026 In control: City Council - 5PM
On agenda: 12/1/2026 Final action:
Title: [Contract] Sacramento Last Mile Project Package 4 (A07001800): Approval of Plans and Specifications [Published for 10-Day Review 11/19/2026]
Attachments: 1. 2026-02014 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

[Contract] Sacramento Last Mile Project Package 4 (A07001800): Approval of Plans and Specifications [Published for 10-Day Review 11/19/2026]

End

 

FileID

File ID: 2026-02014

End

 

Location

Location: Districts 2, 4, 5, 6, 7, and 8

End

 

Recommendation

Recommendation: Pass a Motion: 1) approving the Plans and Specifications for the Sacramento Last Mile Project Package 4 (A07001800); 2) awarding the construction contract for the Sacramento Last Mile Project Package 4 (A07001800) to Pacific Excavation Inc. for an amount not-to-exceed $1,769,388; and 3) authorizing the City Manager or designee to execute the construction contract for the Sacramento Last Mile Project Package 4 (A07001800) to Pacific Excavation Inc. for an amount not-to-exceed $1,769,388.

End

 

Contact

Contact: Adam Randolph, Senior Engineer, (916) 808-7803, arandolph@cityofsacramento.org; Matthew Johns, Supervising Engineer, (916) 808-5760, mjohns@cityofsacramento.org; Ofelia Avalos, Engineering Services Manager, (916) 808-5054, oavalos@cityofsacramento.org; Department of Public Works

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Project Plans

3-Pacific Excavation Contract

End

 

 

 

Additional Description/Analysis

IssueDetail

Issue Detail: On September 29, 2023, staff applied for grant funding through the California Public Utilities Commission (CPUC) Last Mile Federal Funding Account (FFA) to implement the Sacramento Last Mile Connectivity Project to connect unserved communities to affordable broadband infrastructure. The unserved locations were selected based on criteria established by the CPUC's FFA program while overlaying the City network with the FFA Public Map, which identifies areas at the census block level lacking reliable broadband service of at least 25 Mbps downstream and 3 Mbps upstream. On September 13, 2024, the City received an award letter for $38,696,843 after the CPUC voted and approved the grant award in Resolution T-17835. 

 

On October 15, 2024, Council adopted Resolution No. 2024-0309 authorizing staff to accept the Last Mile Connectivity Grant (G07000200) from the CPUC to expand internet access for unserved communities in Sacramento.  These communities across California face many barriers to deploying resilient and accessible broadband networks. To appropriately recognize the capital improvements of this project, staff recommend the budget moved from Last Mile Connectivity Grant (G07000200) to Last Mile Connectivity Project (A07001800).

 

The Sacramento Last Mile Project Package 4 was advertised for construction, and eight bids were received on October 28, 2026. Upon bid analysis, Pacific Excavation, Inc., was found to be the lowest bidder. Staff recommend awarding the construction contract to the lowest and most responsive bidder, Pacific Excavation, Inc.

 

City Council approval is needed to approve plans and specifications, award and execute the agreement with Pacific Excavation, Inc., and proceed with construction.

End

 

PolicyConsiderations

Policy Considerations: This initiative aligns with the Information Technology Department’s Digital Strategy Update 2024-2025 document that includes expanded broadband to underserved communities as a key initiative goal. Investment in infrastructure will strategically position the City for the next economy. The City stands to receive significant short- and long-term economic gains from this Public Private Partnership.

 

Sacramento City Code Section 4.04.020 and Council Rules of Procedure (Chapter 7, Section E.2.d) mandate that unless waived by a 2/3 vote of the City Council, all labor agreements and all agreements greater than $1,000,000 shall be made available to the public at least ten (10) days prior to council action. This item was published for 10-day review on November 19, 2026, in compliance with the City Code.

End

 

EconomicImpacts

Economic Impacts: This new infrastructure is expected to create 7.08 total jobs (4.07 direct jobs and 3.01 jobs through indirect and induced actives) and create $1,092,482 in total economic output ($688,600 of direct output and another $403,882 of output through indirect and induced activities).

 

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period. Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.

End

 

EnvironmentalConsiderations

Environmental Considerations:

California Environmental Quality Act (CEQA): The project is consistent with the 2040 General Plan and certified Master EIR (Resolution No. 2024-0065) is categorically exempt. The infrastructure installation project involves existing small structures and minor alterations to land, including minor trenching and backfilling where the surface is restored as described in sections 15301, 15303, and 15304 (f) of the CEQA Guidelines (14 C.C.R. §§ 15000, et seq.).

End

 

Sustainability

Sustainability: Under Phase 1 of the City of Sacramento’s Climate Action Plan, all applicable “Green” technology initiatives will be considered prior to the purchase of IT cabling and wiring services.

End

 

Commission/Committee Action

Commission/Committee Action: None.

End

 

RationaleforRecommendation

Rationale for Recommendation: Construction of Bid Package 4 will allow the City to achieve the deliverables of the Last Mile Connectivity Project.

 

The Sacramento Last Mile Project Package 4 was advertised for construction, and eight (8) bids were received on October 28, 2026. The results of the bids are summarized below:

 

Contractor

Bid

Pacific Excavation Inc

$1,769,388

Chavez General Engineering

$1,960,000

St. Francis Electric

$2,054,700

Arrow Drillers

$2,140,423

Bear Electrical Solutions, Inc.

$2,150,629

Tennyson Electric LLC

$2,154,600

Teichert Energy & Utilities One

$2,354,500

West Valley Construction

$2,875,485

 

The Engineer’s Estimate was $2,200,000. All bids submitted met all bids requirements. Staff recommend that the construction contract be awarded to the lowest and most responsive and responsible bidder, Pacific Excavation Inc. Construction is anticipated to begin December 2026 and be completed March 2027.

 

End

 

FinancialConsiderations

Financial Considerations: No additional funding is needed. There is sufficient funding in the Last Mile Connectivity Project (A07001800). The City adopted Resolution No. 2024-0309 accepting the Last Mile Grant with the CPUC to receive funding and reimbursement for the fiber installations. There is no local match requirement for the grant.

End

 

LocalBusinessEnterprise

Local Business Enterprise (LBE): Because the project is federally funded with American Rescue Plan Act (ARPA) funds, Local Business Enterprise requirements are held in abeyance.

End