Title
[Contract Supplement] Engineering and Design Services for Combined Closure Project Cannon-Scollan Landfill and Dellar Slope Property
End
FileID
File ID: 2026-01983
End
Location
Location: District 4
End
Recommendation
Recommendation: Pass a Motion: 1) authorizing the City Manager or designee to execute Supplemental Agreement No. 7 to City Agreement No. 2018-1186 with GHD, Inc. for engineering and design services at the City’s closed landfills and extend the term an additional two years through December 31, 2028; and 2) resetting the City Manager’s authority to issue supplemental agreements for City Agreement No. 2018-1186.
End
Contact
Contact: Chris Thoma, Integrated Waste Planning Superintendent, (916) 808-4833, cthoma@cityofsacramento.org; John Febbo, Integrated Waste General Manager, (916) 808-4949, jfebbo@cityofsacramento.org, Department of Public Works
End
Presenter
Presenter: None
End
Attachments
Attachments:
1-Description/Analysis
2-Supplemental Agreement
End
Description/Analysis
IssueDetail
Issue Detail: The Cannon-Scollan Landfill was originally two separate landfills used by the City as refuse disposal sites in the late 1950s. Disposal sites that are no longer receiving waste must be capped and closed in accordance with applicable statutes and regulations. The City is responsible for preparing the Cannon-Scollan Landfill and Dellar Slope property for post-closure maintenance following an approved plan and construction schedule.
GHD, Inc. (GHD) was hired through a competitive process to perform all professional engineering and design tasks for the cap and closure of the Cannon-Scollan Landfill and Dellar Slope property, and these tasks were completed earlier this year. The final outstanding task under this agreement is to decommission and remove or repurpose a gas flare at the 28th Street Landfill. Recycling and Solid Waste staff is requesting approval to extend the term of the contract by two years to December 31, 2028, without a change in the not-to-exceed amount, in order to complete this final task.
End
PolicyConsiderations
Policy Considerations: The recommendations in this report are in accordance with City Code Chapter 3.56 and Administrative Policy 4102 for Professional Services Agreements and City Code Section 3.04.020 for contract amendments. For multi-year contracts that are $250,000 or more, Council approval is needed when an initial term and renewals extend beyond five years.
End
EconomicImpacts
Economic Impacts: None.
End
EnvironmentalConsiderations
Environmental Considerations:
California Environmental Quality Act (CEQA): The City of Sacramento’s Environmental Planning Services has reviewed this project and determined that it is exempt from the provisions of CEQA for the following reasons:
The previous flare system was installed in 1997 during the closure of 28th Street Landfill and has no historical significance, therefore it is not considered a historical resource. CEQA Guidelines section 15064.5 section(a)(3).
The removal or repurpose of the flare would not result in any significant physical impact to the environment, thereby being exempt from CEQA pursuant to the commonsense exemption. Requirements of other regulatory agencies with oversight of the closed landfill shall be satisfied. CEQA Guidelines section 15061(b)(3).
Execution of the contract for general engineering and design is an administrative activity of the City and is not a project under the California Environmental Quality Act (CEQA) and is therefore not subject to CEQA review. CEQA Guidelines section 15378(b)2); 15060(c)(3).
End
Sustainability
Sustainability: The project is consistent with the 2040 General Plan, Goal EJ-1.5 Compatibility with Hazardous Materials Facilities.
End
Commission/Committee Action
Commission/Committee Action: None.
End
RationaleforRecommendation
Rationale for Recommendation: The City of Sacramento completed the cap and closure of the Cannon-Scollan Landfill and Dellar Slope properties earlier this year. The last task of the agreement remains outstanding, which involves an old flare stack at the corner of 28th Street and McKinley Village Way that was built in the mid-1990s. The flare stack became inoperable when the volume of methane gas decreased in the surrounding landfill properties. It was replaced in 2016 with a new flare that is still in operation at the site. GHD will assist the City in determining how to affordably decommission the flare and the best options for recycling or repurposing its parts. GHD is a global firm providing professional engineering work and was procured through RFQ No. Q16014541001.
Staff recommend the City Council approve Supplemental Agreement No. 7 with GHD to continue using funding dedicated to the following tasks:
• Existing Task 3D. Construction Management
• Existing Task 4. On-Call Engineering Support
• Existing Task 8A. Old Flare - Site Prep and Reporting
End
FinancialConsiderations
Financial Considerations: Supplemental Agreement No. 7 to City Agreement No. 2018-1186 will not change the not-to-exceed amount of $417,628. Sufficient funding exists in the Closed City Landfills capital improvement project (Solid Waste Fund 6007 and General Fund 1001) to complete the 1997 Flare Removal project.
End
LocalBusinessEnterprise
Local Business Enterprise (LBE): GHD, Inc. is an LBE.
End