Title
[Contract Supplement] Sacramento Valley Station Regional Commuter Bus Stops Project (T15029000) [Published for 10-Day Review 11/05/2026]
End
FileID
File ID: 2026-01874
End
Location
Location: District 4
End
Recommendation
Recommendation: Pass a Motion: 1) authorizing the City Manager or designee to execute Supplemental Agreement No. 3 to City Agreement No. 2024-1308 with ARUP US, Inc. in an amount not-to-exceed $1,199,737 for a total contract not-to-exceed amount of $1,699,636 for final engineering of the Sacramento Valley Station (SVS) Regional Bus Stops Project (T15029000); and 2) resetting the City Manager or designee’s authority to issue supplemental agreements for City Agreement No. 2024-1308.
End
Contact
Contact: William Shunk, Senior Engineer, (916) 808-2986, wshunk@cityofsacramento.org; Greg Taylor, Supervising Architect, (916) 808-5268, gtaylor@cityofsacramento.org; Ofelia Avalos, Engineering Manager, (916) 808-5054, oavalos@cityofsacramento.org; Department of Public Works
End
Presenter
Presenter: None
End
Attachments
Attachments:
1-Description/Analysis
2-Consultant Agreement
End
Description/Analysis
IssueDetail
Issue Detail: From 2021 to 2022, with funds from Cycle 4 of the Transit and Intercity Rail Capital Program (TIRCP), the Sacramento Area Council of Governments (SACOG) conducted a study for route consolidation that integrates regional commuter bus routes into a unified route that serves both the Sacramento Valley Station and the planned Valley Rail service Midtown Station. The study recommended 17 stop locations that would co-locate bus agencies and provide a maximum seven-minute pedestrian walk from the existing employment centers which the current stops serve. This would result in a 50% reduction in the total number of stop locations that will allow the City to improve curb management for parking and other curbside needs.
The existing transit stop configuration in downtown Sacramento is fragmented and inefficient, consisting of multiple transit agency routes and stop locations that operate independently and lack direct connectivity to passenger rail services at Sacramento Valley Station. This dispersed arrangement reduces the availability of curbside parking and, in some locations, creates conflicts with existing outdoor dining facilities, including curbside dining areas and parklets.
The City of Sacramento successfully applied for a TIRCP grant in the fifth cycle for a suite of improvements to the SVS and its operations, one of which was the implementation of these enhanced bus stops. The Sacramento Valley Station (SVS) Regional Commuter Bus Stops Project (T15029000) will construct 16 new enhanced bus stops serving the region’s bus commute service agencies to/from Downtown Sacramento in a route consolidation that integrates regional commuter routes into a unified route that serves both the Sacramento Valley Station and the planned Valley Rail service Midtown Station.
The City conducted a formal procurement process to retain a qualified professional engineering firm to complete preliminary engineering, environmental clearance, and final design for the Project. Based on the merits of their written proposals, a panel consisting of City staff recommended awarding the contract to the top-ranked firm, ARUP US, Inc. The initial contract was for preliminary engineering and environmental clearance only, with the balance of the contract to be awarded based on project performance and future funding.
The initial scope of work has been satisfactorily completed, and the City has funding in place to move the project forward to final design. City Council approval of the supplemental agreement is necessary to advance to final design.
End
PolicyConsiderations
Policy Considerations: The development of the Project is consistent with the Central City Specific Plan and Railyards Specific Plan and the following 2040 General Plan Policies:
M-1.22 Increase Transit Ridership. The City shall support work to increase transit ridership citywide.
M-1.23 Transit Priority. Where appropriate, the City shall support transit by incorporating features such as bus bulbs, traffic signal priority, queue jumps, and other solutions into priority corridors to improve transit speed, reliability, and operating efficiency while reducing passenger delay.
M-2.10 Curbside Management. The City shall manage the use of curb spaces to meet multimodal demands safely and efficiently.
M-5.2 Sacramento Valley Station. The City shall work to establish Sacramento Valley Station as the premier regional transit hub of Northern California, linking regional rail, light rail, bus, and high-speed rail service, and plan for the expansion of rail service to strengthen connections between Sacramento, the Central Valley, the Bay Area, Northern California, and beyond.
The Sacramento City Code Section 4.04.020 and the City Council Rules of Procedure
(Chapter 7, Section E.2.d) mandate that unless waived by a 2/3 vote of the City Council, all labor agreements, and all agreements greater than $1,000,000 shall be made available to the public at least ten (10) days prior to City Council action. This item was published for 10-day review on November 5, 2026, in compliance with the City Code.
End
EconomicImpacts
Economic Impacts: None.
End
EnvironmentalConsiderations
Environmental Considerations: The requested action is the approval of a professional services agreement for of the design of 16 new enhanced bus stops serving the region’s bus commute service agencies to/from Downtown Sacramento. The approval of the agreement and the project are exempt from review under the California Environmental Quality Act (CEQA) pursuant to Public Resources Code section 21080.25(b)(3). The exemption applies to transit site access and safety improvements. PRC section 21080.25(a)(11). The project is also exempt pursuant the categorical exemption for the operation and minor alteration of existing public facilities, per CEQA Guidelines section 15301.
End
Sustainability
Sustainability: The transportation sector accounts for over 57% of community-wide greenhouse gas emissions, the largest single sector in the community. Providing safe multi-modal transportation alternatives helps to reduce single-occupant vehicle use and contributes towards the Sacramento region’s climate change goals. The Sacramento Valley Station Regional Bus Stops furthers the City’s commitment to sustainability by laying the groundwork for the expanded use of the regional commuter buses and local bus services connecting to the multi-modal transportation hub, which will reduce the use of fossil fuels, encourage less driving, and reduce dependence on private automobiles.
End
Commission/Committee Action
Commission/Committee Action: Not applicable.
End
RationaleforRecommendation
Rationale for Recommendation: The scope of the project includes repurposing existing bus shelters with structural modifications to meet the seismic and wind loading requirements of the greater Sacramento area. The Department of Public Works (Department) does not possess the specialized technical expertise to design these improvements. Furthermore, all design grant funding for this phase must be expended by September 30, 2027 or it may be rescinded. The Department does not have sufficient staffing to design sixteen new bus stops on this timeline. Contracting the design work will augment the Department’s technical and staffing deficiencies and allow City staff to focus instead on project delivery and meeting the grant funding deadlines.
On January 30, 2024, the Department of Public Works advertised a Request for Proposals (RFP) to firms with experience in civil engineering and transit facility design to assist the City in repurposing existing bus shelters for regional agency commuter bus service which will serve Midtown, Downtown, Railyards, and the Sacramento Valley Station.
ARUP was chosen by the panel as the top ranked firm based on the written proposal. A contract for preliminary engineering was executed with ARUP on October 8, 2024. Approval of a supplemental agreement with ARUP is needed for final design.
End
FinancialConsiderations
Financial Considerations: There is sufficient funding in the Sacramento Valley Station (SVS) Regional Bus Stops Project (T15029000) to execute a Supplement No. 3 to Contract No. 2024-1308 with ARUP US, Inc. in an amount not to exceed $1,199,737.
There are no General Funds currently allocated for this agreement.
End
LocalBusinessEnterprise
Local Business Enterprise (LBE): ARUP US, Inc. is qualified as an LBE.
End