Title: [Contract] Arden Way Corrugated Metal Pipe (CMP) Storm Drains Replacement
Attachments: 1. 2026-01243 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

[Contract] Arden Way Corrugated Metal Pipe (CMP) Storm Drains Replacement

End

 

FileID

File ID: 2026-01243

End

 

Location

Location: District 2

End

 

Recommendation

Recommendation: Pass a Motion: 1) approving the contract plans and specifications for the Arden Way Corrugated Metal Pipe (CMP) Storm Drains Replacement Project within the Drainage Collection System Rehabilitation and Replacement (R&R) Program (W14170100); 2) awarding the contract to Gravity Construction for an amount not-to-exceed $541,642; and 3) authorizing the City Manager or designee to execute the construction contract with Gravity Construction.

End

 

Contact

Contact: Brett Grant, Engineering Supervisor, (916) 808-1413, bgrant@cityofsacramento.org; Michelle Carrey, Engineering & Water Resources Division Manager, (916) 808-1438, mcarrey@cityofsacramento.org; Dalia Fadl, Director, (916) 808-3765, dfadl@cityofsacramento.org; Department of Utilities

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Contract

End

 

Description/Analysis

IssueDetail

Issue Detail: Staff recommends City Council award a construction contract to Gravity Construction, to replace approximately 400 lineal feet of CMP with PVC pipe, and approximately 22 lineal feet of reinforced concrete pipe (RCP) at four locations along Arden Way. This project also includes replacement of manholes and drainage inlets, and restoration of pavement, curb, gutter, sidewalk, and landscaping.  All work will occur within the City right-of-way.

 

Segments of the existing drainage pipes in Arden Way have failed, or are at near failure and need to be replaced.  Some pipes have fully collapsed causing localized flooding and several small sinkholes to develop in the roadway.   The proposed project will reduce potential flooding by replacing these segments and restoring storm water conveyance and storage capacity during storms.

End

 

PolicyConsiderations

Policy Considerations: City Council approval is required to award construction contracts of $250,000 or more per City Code section 3.56.090.  The action requested also conforms with City Code section 3.56.120, which provides for award of competitively bid contacts to the lowest responsible bidder. 

End

 

EconomicImpacts

Economic Impacts: This project is expected to create 2.17 total jobs (1.25 direct jobs and 0.92 jobs through indirect and induced activities) and create $334,428.73 in total economic output ($210,792.98 of direct output and another $123,635.74 of output through indirect and induced activities).

 

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER).  CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period.  Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.

End

 

EnvironmentalConsiderations

Environmental Considerations: The subject projects were reviewed and determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Public Resources Code (PRC) 21080.21 (Public Right-Of-Way Pipeline Projects of Less Than One Mile In Length) and CEQA Guidelines Sections 15301 (Existing Facilities) and 15302 (Replacement or Reconstruction). The projects include replacing about 400 feet of existing storm mains and minor alterations of existing streets, sidewalks, and gutters.

End

 

Sustainability

Sustainability: The proposed contract is consistent with the 2040 General Plan’s goals and policies related to public facilities and safety, including providing reliable water, wastewater, and stormwater drainage service to the City of Sacramento: (PFS-3.1). The replacement of failing storm drainage infrastructure supports this goal.

End

 

Commission/Committee Action

Commission/Committee Action: Not applicable.

End

 

RationaleforRecommendation

Rationale for Recommendation: The project was advertised and six bids were received and opened on May 27, 2026. Gravity Construction was the lowest responsible bidder.

The bid results are as follows:

 

Contractor

Amount

Gravity Construction

$541,642

ARB, Inc.

$554,585

Vaca Valley Excavating & Trucking

$607,380

LaFleur Engineering

$818,234

Navajo Pipelines, Inc.

$844,025

Dutch Contracting, Inc.

$915,628

 

The Engineer’s construction cost estimate was $647,426.

End

 

FinancialConsiderations

Financial Considerations: Sufficient funds exist in the Drainage Collection System Rehabilitation and Replacement (R&R) Program (W14170100, Fund 6021) to award a contract to Gravity Construction for an amount not-to-exceed $541,642.

 

There are no General Funds allocated or planned for this project.

End

 

LocalBusinessEnterprise

Local Business Enterprise (LBE): Gravity Construction is not an LBE, but the contract exceeds the project LBE goals through work assigned to their LBE subcontractor.