Title

[Contract Supplement] Folsom Boulevard Safety Improvements (T15235500)

End

 

FileID

File ID: 2026-01829

End

 

Location

Location: Folsom Boulevard between 47th Street and 65th Street, District 4

End

 

Recommendation

Recommendation: Adopt a Resolution: 1) approving the preliminary design plans for the Folsom Boulevard Safety Improvements (T15235500); 2) authorizing the City Manager or designee to transfer $400,000 (Road Maintenance and Rehabilitation, Fund 2036) from the expenditure budget of the Transportation Corridor Program (R15200000) to the expenditure budget of the Folsom Boulevard Safety Improvements (T15235500); 3) authorizing the City Manager or designee to execute Supplemental Agreement No. 8 to City Agreement No. 2023-1202 with Psomas for an amount not-to-exceed $477,114 for a total contract not-to-exceed amount of $935,265 for the Folsom Boulevard Safety Improvements (T15235500); 4) resetting the City Manager’s administrative authority to issue supplemental agreements for City Agreement No. 2023-1202; and 5) authorizing the City Manager’s authority to issue future supplemental agreements to City Agreement No. 2023-1202 be based upon the new contract not-to-exceed amount of $935,265.

End

 

Contact

Contact: Avtar Banwait, Assistant Civil Engineer, (916) 808-6805, abanwait@cityofsacramento.org; Matthew Johns, Supervising Engineer, (916) 808-5760, mjohns@cityofsacramento.org; Ofelia Avalos, Engineering Services Division Manager, (916) 808-5054, oavalos@cityofsacramento.org; Department of Public Works

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Resolution

3-Agreement

4-Preliminary Plans

End

 

Description/Analysis

IssueDetail

Issue Detail: The Folsom Boulevard Safety Improvements Project is intended to enhance roadway safety, reduce vehicle speeds, and improve bicycle connectivity along the Folsom Boulevard corridor. The project will reconfigure the roadway between 59th Street and 65th Street by reducing the number of vehicular travel lanes to calm traffic and converting the excess roadway width to dedicated bicycle facilities. Key project elements include the installation of Class II bicycle lanes between 48th Street and 65th Street and modifications to on-street parking between 48th Street and 53rd Street to accommodate the new roadway configuration.

 

The City conducted a formal procurement process to select a qualified professional engineering firm to complete preliminary engineering, environmental clearance, final design, and construction support for the Folsom Boulevard Safety Improvements Project. Psomas was selected and awarded a professional services agreement (City Agreement No. 2023-1202) for an amount not-to-exceed $416,525 to complete preliminary engineering and environmental documentation (PA/ED) in September 2023, which was increased $41,626 via supplemental agreement in March 2026 for a total amount not-to-exceed $458,151.

 

With satisfactory performance on the PA/ED scope of services contract, staff recommends executing Supplemental Agreement No. 8 to City Agreement No. 2023-1202 with Psomas for the preparation of final plans, specifications, and estimates (PS&E), for an amount not-to-exceed $477,114, and a total contract not-to-exceed amount of $935,265.

 

Per City Code Section 3.04.020 the City Manager’s authority to execute contract supplements is a percentage based upon the original contract amount; however, Section 3.04.020.H allows for that to be modified by Council resolution.  The original professional services agreement (City Agreement No. 2023-1202) awarded to complete the planning and environmental documentation for the Folsom Boulevard Safety Improvements Project was for an amount not-to-exceed $416,525.  The agreement has since been modified through supplement to provide final design services, bringing the new not-to-exceed amount to $935,265.

 

To avoid project delays, and efficiently deliver the corridor improvements through construction, staff recommend that the City Manager’s authority to issue supplemental agreements to City Agreement No. 2023-1202 be reset and the authority to issue future supplements be based upon those percentages specified in City code and the new contract not-to-exceed amount of $935,265.

 

Preliminary engineering plans for the Folsom Boulevard Safety Improvements have been completed. The preliminary plans show the proposed improvements as well as potential improvements to the Folsom Boulevard at 65th Street intersection, which will be analyzed for future projects.

End

 

PolicyConsiderations

Policy Considerations: The Project is consistent with the Sacramento 2040 General Plan goals and key policies of promoting safety and enhancing livability, sustainability, and economic vitality as follows: The project promotes the development of an interconnected City (GP LUP-2.2), healthy transportation system options (GP M-1.3), increase bicycling and walking (GP M-1.11), improve walking connectivity (GP M-1.15), improve bicycling connectivity (GP M-1.17).

 

The project is consistent with the Mobility Element to create a well-connected transportation network through integration of recreation and community facilities with other public spaces and rights-of-way.

 

The Sacramento City Code Section 3.04.020 limits the authority of the City Manager to execute contract amendments to a cumulative total of 10% based upon the original contact price. Supplemental Agreement No. 8 exceeds the cumulative total of supplemental agreements, requiring approval of the City Council to authorize the execution of this supplemental agreement and resetting the City Manager’s authority to execute contract amendments.

 

Under Section 3.04.020, the City Manager’s contracting authority to execute amendments is limited by the cumulative amendment thresholds tied to the original contract amount. Because the contract has grown over time and the forthcoming amendment will exceed the City Manager’s available authority under subsection A, City Council approval is required to increase the new total not‑to‑exceed amount and reset the City Manager’s amendment authority pursuant to subsection D.

End

 

EconomicImpacts

Economic Impacts: None.

End

 

EnvironmentalConsiderations

Environmental Considerations: The Community Development Department, Environmental Planning Services Division has reviewed this Folsom Boulevard Safety Improvements Project and determined that the project is exempt from the provisions of the California Environmental

Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301, Existing Facilities. The project consists of the operation, repair, maintenance, or minor alteration of existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities and other similar alterations that do not create additional automobile lanes.

End

 

Sustainability

Sustainability: The project is consistent with sustainability goals of optimizing the transportation system and developing a universally accessible, safe, convenient, integrated, and well-connected pedestrian system. Transportation is also responsible for 57% of Sacramento’s local greenhouse gas emissions, the single largest sector. Providing safe and bikeable transportation alternatives helps to reduce single-occupant vehicle use and will contribute towards Sacramento’s climate change goals.

End

 

Commission/Committee Action

Commission/Committee Action: The Project was presented to the Active Transportation Commission on May 16, 2024. The Project was presented to the Disabilities Advisory Commission on June 5, 2024. The DAC noted the accessibility benefits to the corridor approach to safety as preferred over spot improvements.

End

 

RationaleforRecommendation

Rationale for Recommendation: The City conducted a formal procurement process to select a qualified professional engineering firm to complete preliminary engineering, environmental clearance, final design, and construction support for the Folsom Boulevard Safety Improvements. Psomas was selected and awarded an initial contract to provide PA/ED services. Preliminary design plans for the project have been completed.  A supplemental agreement and budgetary adjustments are needed for Psomas to complete the final design and prepare the project for construction.

 

Approval by the City Council is required to execute Supplemental Agreement No. 8 to complete final design and make the budgetary adjustments necessary to deliver the project.

End

 

FinancialConsiderations

Financial Considerations: The estimated total cost to complete preliminary engineering, environmental clearance, and final design for the Folsom Boulevard Safety Improvements (T15235500) is approximately $1.5 million. With the transfer of $400,000 (Road Maintenance and Rehabilitation, Fund 2036) there will be sufficient funding to execute Supplemental Agreement No. 8 to City Agreement No. 2023-1202 with Psomas for an amount not-to-exceed $477,114 and cover the staff costs to complete design.

 

There are no General Funds allocated for this project.

End

 

LocalBusinessEnterprise

Local Business Enterprise (LBE): Psomas is an LBE.  The contract award complies with the LBE participation goal of 5%.