Title
[Contract] Sump 157 Security Improvements
End
FileID
File ID: 2026-00187
End
Location
Location: District 2
End
Recommendation
Recommendation: Pass a Motion: 1) approving the contract plans and specifications for the Sump 157 Security Upgrade Project (W14130600); 2) awarding the contract to Pisor Fence Division, Inc. for an amount not to exceed $531,897; and 3) authorizing the City Manager or designee to execute the construction contract with Pisor Fence Division, Inc.
End
Contact
Contact: Brett Grant, Supervising Engineer, (916) 808-1413, bgrant@cityofsacramento.org; Sherill Huun, Engineering & Water Resources Division Manager, (916) 808-1455, shuun@cityofsacramento.org; Dalia Fadl, Director, (916) 808-3765, dfadl@cityofsacramento.org; Department of Utilities
End
Presenter
Presenter: None
End
Attachments
Attachments:
1-Description/Analysis
2-Agreement
End
Description/Analysis
IssueDetail
Issue Detail: Staff recommends Council award a construction contract to Pisor Fence Division, Inc., to replace portions of the existing fencing and upgrade the lighting at Sump 157.
End
PolicyConsiderations
Policy Considerations: City Council approval is required to award contracts of $250,000 or more. The action requested conforms with City Code section 3.56.020, which provides for award of competitively bid contracts to the lowest responsible bidder.
En
EconomicImpacts
Economic Impacts: The construction portion of this project is expected to create 2.13 total jobs (1.22 direct jobs and 0.90 jobs through indirect and induced activities) and create $328,411.82 in total economic output ($207,000.48 of direct output and another $121,411.34 of output through indirect and induced activities).
The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period. Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.
End
EnvironmentalConsiderations
Environmental Considerations: The project to replace existing fencing and upgrade lighting has been determined to be categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Sections 15301 (Existing Facilities) and 15302 (Replacement or Reconstruction). The project includes operation, repair, maintenance, or minor alteration of existing facilities (15301); and the replacing of existing security improvements at Sump 157 (utility systems) involving no expansion of capacity (15302 (c)).
End
Sustainability
Sustainability: The proposed project is consistent with the 2040 General Plan Policy PFS-2.2 as it protects and maintains critical infrastructure by replacing damaged, substandard and impaired fencing with new fencing that exceeds current standards, and upgrades lighting to LED which will greatly increase security at the site.
End
Commission/Committee Action
Commission/Committee Action: Not applicable.
End
RationaleforRecommendation
Rationale for Recommendation: The project was advertised, and six bids were received and opened on December 3, 2025. Upon bid opening, Anaba Construction, Inc. was determined to be the low bidder, but due to estimating abnormalities they have requested that the City of Sacramento allow them to withdraw their bid. Therefore, Pisor Fence Division, Inc. is now the lowest responsible and responsive bidder.
The bid results are as follows:
|
Contractor |
Amount |
|
Pisor Fence Division, Inc. |
$531,897 |
|
Roebbelen Contracting, Inc. |
$671,665 |
|
EVT Builders |
$675,000 |
|
CWS Construction Group, Inc. |
$745,000 |
|
Sloan Security Group, Inc. |
$833,208 |
|
Anaba Construction Inc. BID WITHDRAWN |
$495,200 |
The Engineer’s construction cost estimate was $504,565.
End
FinancialConsiderations
Financial Considerations: Sufficient funds exist in the Drainage Sump Replacement & Rehabilitation Program (W14130600, Fund 6021) to award a contract to Pisor Fence Division, Inc., for an amount not to exceed $531,897.
There are no General Funds allocated or planned for this contract.
End
LocalBusinessEnterprise
Local Business Enterprise (LBE): Pisor Fence Division, Inc. is a LBE.
End
Background
Background: Sump 157 was originally constructed in 1955 by the Sacramento and San Joaquin Drainage District to pump stormwater from Magpie Creek and the I-80 South Drive to the Natomas East Main Drainage Canal. In 1993, the ownership of the sump station was transferred to the City of Sacramento. Because of its location, vandalism and trespassing has been a recurring issue at the station and its surrounding area. Some recorded incidents include graffiti, illegal dumping, loitering, damage to city property (fences, locks, gates, and electrical equipment), aggressive dogs, and gunshots.