Title: [Contract Amendment] Change Order: North 5th Street Parallel Trunk Main Project
Attachments: 1. 2026-01995 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

[Contract Amendment] Change Order: North 5th Street Parallel Trunk Main Project

End

 

FileID

File ID: 2026-01995

End

 

Location

Location: District 4

End

 

Recommendation

Recommendation: Pass a Motion: 1) authorizing the City Manager or designee to execute Change Order No. 2 to City Agreement No. PRC004314 with Steve P. Rados, Inc., for an amount not to exceed $639,166, bringing the agreement’s total not-to-exceed amount to $3,589,971; and 2) resetting the City Manager or designee’s authority to issue contract amendments for the Agreement.

End

 

Contact

Contact: Tim Moresco, Project Manager, (916) 808-1432, tmoresco@cityofsacramento.org; Michelle Carrey, Engineering & Water Resources Division Manager, (916) 808-1438, mcarrey@cityofsacramento.org; Dalia Fadl, Director, (916) 808-3765, dfadl@cityofsacramento.org; Department of Utilities

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Change Order

End

 

Description/Analysis

IssueDetail

Issue Detail: Staff recommend City Council approve Change Order No. 2 with Steve P. Rados, Inc., on Agreement No. PRC004314 in the amount of $639,166 to compensate the Contractor for installing an additional 136 linear feet of Fiberglass Reinforced Plastic (FRP) pipe on the North 5th Street Parallel Trunk Main Project. The original contract scope was completed under budget, and eligible grant funding remained available. To fully utilize the remaining funds, the City advanced work eligible to receive grant funding that had previously been planned for a future phase. With this change order, the contract’s total not-to-exceed amount will increase from $2,950,804 to $3,589,970.

 

The project is funded by reimbursement through the Sacramento Area Council of Governments (SACOG) Green Means Go grant, which supports stormwater infrastructure improvements and future development within the River District. All work must comply with the requirements of the funding agreement, including a construction completion deadline of December 31, 2026.

 

The original project scope included a short FRP stub-out of the 84-inch pipe from the newly constructed junction structure, with a future project planned to complete the final connection to the Sump 111 pump station at the northern end of North 5th Street, which discharges stormwater to the American River. The project’s purpose was to increase stormwater storage and conveyance capacity through the installation of a new parallel 72-inch trunk line. Consistent with that purpose, Change Order No. 2 extends the 84-inch FRP pipe an additional 136 linear feet toward Sump 111, increasing conveyance capacity and advancing the future connection to Sump 111. Because grant funds must be expended before December 31, 2026, and the additional work was eligible to receive grant funding, the City directed the Contractor to provide pricing for this work. The final connection to the pump station will be designed and constructed under a separate future project.

End

 

PolicyConsiderations

Policy Considerations: This Change Order exceeds the City Manager’s approval authority and requires Council approval pursuant to City Code section 3.04.020.

End

 

EconomicImpacts

Economic Impacts: This phase of the project is expected to create 2.56 total jobs (1.47 direct jobs and 1.09 jobs through indirect and induced activities) and create $394,643.46 in total economic output ($248,746.79 of direct output and another $145,896.67 of output through indirect and induced activities).

 

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER).  CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period.  Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.

End

 

EnvironmentalConsiderations

Environmental Considerations: The subject project was reviewed and determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Public Resources Code (PRC) 21080.21 (Public Right-Of-Way Pipeline Projects of Less Than One Mile In Length) and CEQA Guidelines Section 15301 (Existing Facilities). The project consists of placing about 1,600 linear feet of new parallel 72-inch storm drain pipe and minor alterations of existing streets, sidewalks, and gutters.

End

 

Sustainability

Sustainability: The proposed project is consistent with Goal PFS-3.1 in the 2040 General Plan as it improves infrastructure reliability and capacity. The project also supports development to reduce individual development project mitigation.

End

 

Commission/Committee Action

Commission/Committee Action: Not applicable.

End

 

RationaleforRecommendation

Rationale for Recommendation: Change Order No. 2 is necessary to compensate the Contractor for all labor, equipment, markup, surcharges, and fees associated with installing 136 linear feet of 84-inch FRP pipe, the associated saddle manhole, and surface restoration associated with the pipe extension. The value of Change Order No. 2 exceeds the City Manager’s approval authority because the cumulative total of all contract amendments exceeds 8% of the original contract amount, and this amendment increases the contract by more than $250,000. Therefore, City Council approval is required in accordance with City Code sections 3.04.020.A.3 and 3.04.020.B.

End

 

FinancialConsiderations

Financial Considerations: The original not-to-exceed amount of the contract was $2,791,735. The net change by previous change orders is $159,070, bringing the contract not-to-exceed amount to $2,950,805. Change Order No. 2, in the amount of $639,166, will increase the contract not-to-exceed amount to $3,589,971. There are sufficient funds in the Drainage Improvement Program (W14150700; Fund 6211) to execute this Change Order.

 

There are no General Funds allocated or planned for this project.