Title: [Contract] Carlson Drive Rehabilitation Project (R15200000): Construction Contract Award
Attachments: 1. 2026-01185 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

[Contract] Carlson Drive Rehabilitation Project (R15200000): Construction Contract Award

End

 

FileID

File ID: 2026-01185

End

 

Location

Location: Carlson Drive, from H Street to Sandburg Drive, Sandburg Drive from Carlson Drive to Camellia Avenue, and Camellia Avenue from H Street to Sandburg Drive; District 4

End

 

Recommendation

Recommendation: Pass a Motion: 1) approving the Plans and Specifications for the Carlson Drive Rehabilitation Project (R15200000); 2) awarding the construction contract to American Pavement Systems, Inc. for an amount not-to-exceed $523,626 for the Carlson Drive Rehabilitation Project; and 3) authorizing the City Manager or the designee to execute the contract for an amount not-to-exceed $523,626 for the Carlson Drive Rehabilitation Project.

End

 

Contact

Contact: Sabrina Martin, Junior Engineer, (916) 808-7804, smartin@cityofsacramento.org; Adam Randolph, Senior Engineer, (916) 808-7803, arandolph@cityofsacramento.org; Ofelia Avalos, Engineering Manager, (916) 808-5054; oavalos@cityofsacramento.org; Department of  Public Works

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Construction Contract: Carlson Drive Rehabilitation Project

3-Carlson Drive Project Plans

4-Carlson Drive Project Specifications

End

 

Description/Analysis

IssueDetail

Issue Detail: The Carlson Drive Rehabilitation Project includes resurfacing Carlson Drive from H Street to Glenn Hall Park, as well as key entryway segments of Sandburg Drive and Camellia Avenue Due to roadway deterioration caused by heavy construction truck traffic, particularly from the United States Army Corp of Engineers (USACE) bank protection projects, these streets are being restored to a state of good repair.

 

The Carlson Drive Rehabilitation Project was advertised on April 29, 2026, and three bids were received. Staff recommend awarding the construction contract to the lowest and most responsive bidder, American Pavement Systems, Inc.

End

 

PolicyConsiderations

Policy Considerations: The requested action aligns with the City’s General Plan goals by supporting the continued maintenance of public streets through the use of a pavement management system and associated maintenance program (M-1.39 Maintain the Street System). In addition, it advances transportation safety objectives by implementing traffic calming measures in front of Caleb Greenwood Elementary and increasing visibility at street crossings (M-3.3 Traffic).

 

The recommendations in this report are consistent with City Code Chapters 3.60 and 3.64 (Participation of Local Business Enterprises).

End

 

EconomicImpacts

Economic Impacts: This new infrastructure is expected to create 2.09 total jobs (1.2 direct jobs and 0.89 jobs through indirect and induced actives) and create $323,305 in total economic output ($203,782 of direct output and $119,524 of output through indirect and induced activities).

 

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER).  CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period.  Actual impact could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.

End

 

EnvironmentalConsiderations

Environmental Considerations:

California Environmental Quality Act (CEQA): The Community Development Department, Environmental Planning Services Division has determined that the Carlson Drive Rehabilitation Project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under Class 1, Section 15301 (c) - Existing Facilities

                     

Projects exempted under Class 1, Section 15301(c) consist of the operation, repair and minor alteration of existing public facilities, mechanical equipment, and topographical features including existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities.

 

The Carlson Drive Rehabilitation Project involves pavement rehabilitation improvements to address deterioration along the existing roadway segments identified within the project limits.

End

 

Sustainability

Sustainability: None.

End

 

Commission/Committee Action

Commission/Committee Action: None.

End

 

RationaleforRecommendation

Rationale for Recommendation: The Carlson Drive Rehabilitation Project was advertised for construction, and three bids were received on May 20, 2026. 

 

The bids received are summarized below:

Contractor

Bid Amount

LBE Requirement (5% Goal)

American Pavement Systems, Inc.

$523,626.00

8.14%

Pavement Coatings, Inc.

$536,674.00

64.55%

VSS International

$580,211.00.

5.26%

 

The Engineer’s estimate was $776,000.

 

Staff recommends that the construction contract be awarded to the lowest, responsive, and responsible bidder, American Pavement Systems, Inc.

End

 

FinancialConsiderations

Financial Considerations: The Carlson Drive Rehabilitation project has a total estimated cost of $1,399,896, including design, construction and construction management. There is adequate funding (Road Maintenance and Rehabilitation Account, Fund 2036) within the Transportation Corridor Program (R15200000) to award the construction contract.

End

 

LocalBusinessEnterprise

Local Business Enterprise (LBE): American Pavement Systems, Inc. is not an LBE but has committed to meet or exceed the minimum LBE participation requirement through both material suppliers and subcontractors.