File #: 2025-01789    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 10/3/2025 In control: City Council - 2PM
On agenda: 2/24/2026 Final action:
Title: [Contract] I Street Bridge Railing Repair Project (R15222200)
Attachments: 1. 2025-01789 [Contract] I Street Bridge Railing Repair Project (R15222200)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

[Contract] I Street Bridge Railing Repair Project (R15222200)

End

 

FileID

File ID: 2025-01789

End

 

Location

Location: I Street Bridge, west of Jibboom Street, District 4

End

 

Recommendation

Recommendation: Pass a Motion ratifying the City Manager or designee execution of City Agreement No. 2025-4539 with D N B Infrastructure, Inc., for emergency repairs on the I Street Bridge railing for an amount not-to-exceed $341,824.

End

 

Contact

Contact: Sabrina Martin, Junior Engineer, (916) 808-7804, smartin@cityofsacramento.org; Judith Matsui-Drury, Supervising Engineer, (916) 808-7610, jmatsui-drury@cityofsacramento.org; Ofelia Avalos, Engineering Manager, (916) 808-5054, oavalos@cityofsacramento.org; Department of Public Works

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Construction Contract

End

 

Description/Analysis

IssueDetail

Issue Detail: Staff recommends Council ratify City Agreement No. 2025-4539 with D N B Infrastructure, Inc., for emergency repairs to damaged railings on the I Street Bridge. This report provides information to the City Council about an emergency contract issued by the Department of Public Works to D N B Infrastructure, Inc., under the City Manager’s authority. Competitive bidding was suspended and an emergency contract was issued on September 29, 2025, to repair the damaged railing on the I Street Bridge viaduct over the Union Pacific Railroad in the amount of $341,824.

End

 

PolicyConsiderations

Policy Considerations: This action is consistent with Sacramento City Code Chapter 3.56.260; when public interest and necessity demand immediate action, repair, or replacement to safeguard life, health, or property, to permit the continued conduct of city operations or services, or to mitigate further damage, and the cost is estimated to exceed $250,000, the City Manager may immediately execute a contract. The City Manager is required to subsequently present a report describing the emergency, the actions taken, and the number and costs of contracts entered into with outside vendors or contractors.

End

 

EconomicImpacts

Economic Impacts: The repairment of this infrastructure is expected to create 1.37 total jobs (0.79 direct jobs and 0.58 jobs through indirect and induced actives) and create $211,054 in total economic output ($133,029 of direct output and another $78,025 of output through indirect and induced activities).

 

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER).  CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period.  Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.

End

 

EnvironmentalConsiderations

Environmental Considerations:

California Environmental Quality Act: This project has been determined Categorically Exempt from CEQA review by the Environmental Planning Services Division. A notice of exemption was filed on October 17, 2025. This project involves the repair and maintenance of an existing public facility involving no expansion of the existing or prior use and is covered by the categorical exemption for existing facilities in CEQA Guidelines Section 15301. None of the exceptions set forth in CEQA Guidelines 15300.2 are present.

End

 

Sustainability

Sustainability: Not applicable.

End

 

Commission/Committee Action

Commission/Committee Action: None.

End

 

RationaleforRecommendation

Rationale for Recommendation: Immediate railing repairs to the I Street Bridge were necessary to address public safety. Both the Public Works Director and Engineering Manager concurred that the project qualified as an emergency. D N B Infrastructure, Inc. was selected based on their prior experience and performance on projects for the City of Sacramento.

 

Due to the bridge’s location, coordination with Union Pacific Railroad and the U.S. Coast Guard was essential to ensure the safe and timely execution of the repairs.

 

Union Pacific Railroad scheduled a 10-day bridge closure to conduct essential maintenance work, creating a limited window of opportunity for the city to complete the repairs without causing additional traffic disruptions. To take advantage of this closure, D N B Infrastructure, Inc. mobilized quickly and completed the necessary repairs between October 13-15, 2025.

End

 

FinancialConsiderations

Financial Considerations: The I Street Bridge Railing Repair Project has a total estimated cost of $416,000.There is sufficient funding within the Bridge Maintenance Program R15222200 to ratifying the City Manager or designee execution of City Agreement No.2025-4539 with D N B Infrastructure, Inc., for emergency repairs on the I Street Bridge railing for an amount not-to-exceed $341,824 (Gas Tax, Fund 2002).

End

 

LocalBusinessEnterprise

Local Business Enterprise (LBE): D N B Infrastructure is an LBE.

End

 

Background

Background: The project consisted of removing damaged railing and replacing it in kind with new railing on the northern side of the I Street Bridge. The damage was caused by a vehicular accident, which completely dislodged a portion of the railing, creating an immediate concern for public safety. As a temporary measure, K-rail barriers were installed until the permanent repairs could be made.  These immediate actions were necessary for public safety and to maintain safe operation and access along I Street, west of Jibboom Street. City staff scheduled this Council item once the final contractor costs were received so that all relevant information could be presented to Council at one time.