Legislation Details

File #: 2025-01131    Version: 1
Type: Consent Item Status: Passed
File created: 5/15/2025 In control: City Council - 5PM
On agenda: 6/10/2025 Final action: 6/10/2025
Title: Contract: South Area Corporation Yard (SACY) Building 22 Roof Restoration (Z14140600)

Title

Contract: South Area Corporation Yard (SACY) Building 22 Roof Restoration (Z14140600)

End

 

FileID

File ID: 2025-01131

End

 

Location

Location: 5730 24th Street, District 5

End

 

Recommendation

Recommendation: Pass a Motion 1) awarding a construction contract to Madsen Roofing & Waterproofing, Inc., in an amount not to exceed $264,237 for the Sacramento Area Corporation Yard (SACY) Building 22 Roof Restoration; and 2) authorizing the Interim City Manager or the designee to execute the contract specified above.

End

 

Contact

Contact: Norm Colby, Facilities & Real Property Superintendent, ncolby@cityofsacramento.org, (916) 808-8335; James Christensen, Facilities Manager, jechristensen@cityofsacramento.org,

(916) 808-5863; Department of Public Works

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Contract- Madsen Roofing & Waterproofing, Inc.

End

 

Description/Analysis

IssueDetail

Issue Detail: The existing roof of SACY Building 22 is nearing the end of its useful life and requires restoration. The recommended contract with Madsen Roofing & Waterproofing will include removal of compromised base flashings, and the application of a Tremco Alpha Guard Roof Coating. 

End

 

PolicyConsiderations

Policy Considerations: The recommendations in this report are in accordance with the provisions of the City Code Chapter 3.56, which requires City Council approval for contracts over $250,000 or more.

End

 

EconomicImpacts

Economic Impacts: The recommended contract is expected to create 1.96 jobs (1.24 direct jobs and .72 jobs through indirect and induced activities) and create $258,033 in total economic output ($165,406 of direct output and another $92,627 of output in indirect and induced activities).

 

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period. Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences. 

End

 

EnvironmentalConsiderations

Environmental Considerations: California Environmental Quality Act: No environmental review is necessary because the recommendations in this report involve the repair of an existing structure with no expansion beyond the previously existing level of use and are therefore considered to be an exempt project or activity in accordance with Section 15301 of the CEQA Guidelines.

End

 

Sustainability

Sustainability: None.

End

 

Commission/Committee Action

Commission/Committee Action: Not applicable.

End

 

RationaleforRecommendation

Rationale for Recommendation: The existing roof of the SACY Building 22 has been identified as a priority by the Department of Utilities (DOU) and the Public Works Facilities Division and was included in DOU’s Deferred maintenance project lists for FY2024/25.  On April 3, 2025, the Department of Public Works issued Invitation for Bid (IFB) No. B25014541004. Four bids were received, two of which were determined to be responsive in meeting the minimum local business enterprise (LBE) participation requirement. Two of the contractors failed to list any subcontractors or suppliers to meet the LBE participation requirement.  Madsen Roofing & Waterproofing, Inc. was determined to be the lowest responsive and responsible bidder. Work is anticipated to begin on site in July of 2025 if the weather conditions are optimal. 

 

The results of IFB No. B25014541004 are listed in the table below.     

 

CONTRACTOR

Bid Amount

Madsen Roofing & Waterproofing, Inc

$264,237

Pacific Polymers Inc. dba American Foam Experts 

$275,318

Brazos Urethane *

$304,100

Barth Roofing Company, Inc.

$381,000

            *Did not meet the minimum LBE participation requirement.

End

 

FinancialConsiderations

Financial Considerations: Sufficient funding exists in the SACY Building 22 Roof Restoration project (Z14140600) to award a construction contract to Madsen Roofing & Waterproofing, Inc. not to exceed $264,237 and cover remaining project costs.

End

 

LocalBusinessEnterprise

Local Business Enterprise (LBE): Madsen Roofing & Waterproofing, Inc. is an LBE.

End