Title
Agreement: Engineering Services for the Sump 107 Rehabilitation Project
End
FileID
File ID: 2025-01100
End
Location
Location: District 4
End
Recommendation
Recommendation: Pass a Motion authorizing the Interim City Manager or designee to execute a Professional Services Agreement with Brown and Caldwell to provide engineering design and project coordination services for the Sump 107 Rehabilitation Project (X14170500, Fund 6006 and Fund 6021), for an amount not-to-exceed $649,928.
End
Contact
Contact: Kyle Beltran, Project Manager, (916) 808-3828, kbeltran1@cityofsacramento.org;
Roxanne Dilley, Supervising Engineer, (916) 808-1458, rdilley@cityofsacramento.org;
Sherill Huun, Interim Director, (916) 808-1455, shuun@cityofsacramento.org; Department of Utilities
End
Presenter
Presenter: None
End
Attachments
Attachments:
1-Description/Analysis
2-Agreement
End
Description/Analysis
IssueDetail
Issue Detail: Staff recommends Council approve an agreement with Brown and Caldwell for the engineering design and project coordination services for the Sump 107 Rehabilitation Project. This project has been identified as a high priority project by the Department of Utilities (DOU), through a business case evaluation performed in 2022 by Brown and Caldwell, which analyzed multiple alternatives to improve the pump station’s reliability and performance, while also considering accessibility, maintenance, construction risks, consequence of failure, and alignment with the City’s goals. Services for this contract include, but are not limited to, preliminary and final design engineering; construction document preparation; and bidding and construction support.
Sump 107 is a critical part of the Combined Sewer System (CSS) and receives both wastewater and drainage flows from Sacramento’s Old Town area and the adjacent Embassy Suites. Sump 107 was initially constructed in 1967 and was later upgraded in 1990, coinciding with the construction of the office building that now sits atop the sump station. This project will involve strong collaboration and stakeholder engagement among the City, Brown and Caldwell, the office building management, and all other relevant parties to ensure project success. The initial design concept for Sump 107 includes, but is not limited to, the installation of three submersible pumps, a new permanent generator, replacement of the check valve at the sump inlet, removal and replacement of the inlet manhole with a sealed cover, HVAC system modifications, and installation of a new access hatch. This project will help improve the station’s functionality and reliability and City Staff’s ability to perform maintenance.
End
PolicyConsiderations
Policy Considerations: City Council approval is required for professional service agreements of $250,000 or more per City Code 3.04.010.
End
EconomicImpacts
Economic Impacts: None.
End
EnvironmentalConsiderations
Environmental Considerations: This project is exempt from the California Environmental Quality Act (CEQA) under Section 15301 of the CEQA Guidelines governing existing facilities, in that it meets the definition of restoration or rehabilitation of deteriorated or damaged structures, facilities, or mechanical equipment to meet current standards of public health and safety.
End
Sustainability
Sustainability: The proposed project is consistent with the 2040 General Plan Policy PFS-3.6 as it will rehabilitate and improve the CSS, by extending the life of this critical infrastructure.
End
Commission/Committee Action
Commission/Committee Action: Not applicable.
End
RationaleforRecommendation
Rationale for Recommendation: On November 14, 2024, a Request for Proposal (RFP) (#P24141311043) was advertised and issued on PlanetBids for engineering services on the Sump 107 Rehabilitation Project. On the due date of December 19, 2024, three (3) proposals were received from the following firms:
1. Alisto Inc.
2. Brown and Caldwell
3. Stantec Consulting Services Inc.
A 5-member evaluation team that included staff from DOU Engineering and Operations & Maintenance evaluated the proposals. Brown and Caldwell was the top-ranked firm.
End
FinancialConsiderations
Financial Considerations: The proposed agreement is for an amount not-to-exceed $649,928. Sufficient funding exists in the Combined Sewer System Sump/Treatment Facilities Program (X14170500, Fund 6006 and Fund 6021) to award the agreement.
There are no General Funds allocated or planned for this project.
End
LocalBusinessEnterprise
Local Business Enterprise (LBE): Brown and Caldwell is an LBE.