Legislation Details

File #: 2025-01100    Version: 1
Type: Consent Item Status: Passed
File created: 5/8/2025 In control: City Council - 5PM
On agenda: 6/10/2025 Final action: 6/10/2025
Title: Agreement: Engineering Services for the Sump 107 Rehabilitation Project

Title

Agreement: Engineering Services for the Sump 107 Rehabilitation Project

End

 

FileID

File ID: 2025-01100

End

 

Location

Location: District 4

End

 

Recommendation

Recommendation: Pass a Motion authorizing the Interim City Manager or designee to execute a Professional Services Agreement with Brown and Caldwell to provide engineering design and project coordination services for the Sump 107 Rehabilitation Project (X14170500, Fund 6006 and Fund 6021), for an amount not-to-exceed $649,928.

End

 

Contact

Contact: Kyle Beltran, Project Manager, (916) 808-3828, kbeltran1@cityofsacramento.org;

Roxanne Dilley, Supervising Engineer, (916) 808-1458, rdilley@cityofsacramento.org;

Sherill Huun, Interim Director, (916) 808-1455, shuun@cityofsacramento.org; Department of Utilities

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Agreement

End

 

Description/Analysis

IssueDetail

Issue Detail: Staff recommends Council approve an agreement with Brown and Caldwell for the engineering design and project coordination services for the Sump 107 Rehabilitation Project. This project has been identified as a high priority project by the Department of Utilities (DOU), through a business case evaluation performed in 2022 by Brown and Caldwell, which analyzed multiple alternatives to improve the pump station’s reliability and performance, while also considering accessibility, maintenance, construction risks, consequence of failure, and alignment with the City’s goals. Services for this contract include, but are not limited to, preliminary and final design engineering; construction document preparation; and bidding and construction support.

 

Sump 107 is a critical part of the Combined Sewer System (CSS) and receives both wastewater and drainage flows from Sacramento’s Old Town area and the adjacent Embassy Suites. Sump 107 was initially constructed in 1967 and was later upgraded in 1990, coinciding with the construction of the office building that now sits atop the sump station. This project will involve strong collaboration and stakeholder engagement among the City, Brown and Caldwell, the office building management, and all other relevant parties to ensure project success. The initial design concept for Sump 107 includes, but is not limited to, the installation of three submersible pumps, a new permanent generator, replacement of the check valve at the sump inlet, removal and replacement of the inlet manhole with a sealed cover, HVAC system modifications, and installation of a new access hatch. This project will help improve the station’s functionality and reliability and City Staff’s ability to perform maintenance.

End

 

PolicyConsiderations

Policy Considerations: City Council approval is required for professional service agreements of $250,000 or more per City Code 3.04.010. 

End

 

EconomicImpacts

Economic Impacts: None.

End

 

EnvironmentalConsiderations

Environmental Considerations: This project is exempt from the California Environmental Quality Act (CEQA) under Section 15301 of the CEQA Guidelines governing existing facilities, in that it meets the definition of restoration or rehabilitation of deteriorated or damaged structures, facilities, or mechanical equipment to meet current standards of public health and safety.

End

 

Sustainability

Sustainability: The proposed project is consistent with the 2040 General Plan Policy PFS-3.6 as it will rehabilitate and improve the CSS, by extending the life of this critical infrastructure.

End

 

Commission/Committee Action

Commission/Committee Action: Not applicable.

End

 

RationaleforRecommendation

Rationale for Recommendation: On November 14, 2024, a Request for Proposal (RFP) (#P24141311043) was advertised and issued on PlanetBids for engineering services on the Sump 107 Rehabilitation Project. On the due date of December 19, 2024, three (3) proposals were received from the following firms: 

 

1.                     Alisto Inc.

2.                     Brown and Caldwell

3.                     Stantec Consulting Services Inc.

 

A 5-member evaluation team that included staff from DOU Engineering and Operations & Maintenance evaluated the proposals. Brown and Caldwell was the top-ranked firm.   

End

 

FinancialConsiderations

Financial Considerations: The proposed agreement is for an amount not-to-exceed $649,928. Sufficient funding exists in the Combined Sewer System Sump/Treatment Facilities Program (X14170500, Fund 6006 and Fund 6021) to award the agreement.

 

There are no General Funds allocated or planned for this project.

End

 

LocalBusinessEnterprise

Local Business Enterprise (LBE): Brown and Caldwell is an LBE.

End