Legislation Details

File #: 2026-01871    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 10/7/2026 In control: City Council - 5PM
On agenda: 11/10/2026 Final action:
Title: [Grant Application] Authorization to Apply for Transportation Grants: Solutions for Congested Corridors Program (SCCP) Grant (Cycle 5)
Attachments: 1. 2026-01871 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

[Grant Application] Authorization to Apply for Transportation Grants: Solutions for Congested Corridors Program (SCCP) Grant (Cycle 5)

End

 

FileID

File ID: 2026-01871

End

 

Location

Location: District 4

End

 

Recommendation

Recommendation: Adopt a Resolution: 1) authorizing the City Manager or designee to submit an application for the Solutions for Congested Corridors Program (SCCP) grant (Cycle 5); and 2) authorizing the City Manager or designee to execute the grant agreements and any related grant documents upon award.

End

 

Contact

Contact: Greg Taylor, Supervising Architect, (916) 808-5268, gtaylor@cityofsacramento.org; Ofelia Avalos, Engineering Manager, (916) 808-5054, oavalos@cityofsacramento.org; Department of Public Works

End

 

Presenter

Presenter: None

End

 

Attachments

Attachments:

1-Description/Analysis

2-Resolution-Final

End

 

Description/Analysis

IssueDetail

Issue Detail: The California Transportation Commission issued a call for projects for the Solutions for Congested Corridors Program (SCCP) grant (Cycle 5) on August 20, 2026. The application nominations are due November 19, 2026, with no matching funds required. The SCCP has a funding capacity of $549,555,000 for the 2026 program.

 

Sacramento Valley Station (SVS) is the centerpiece of a long-range vision to create Northern California’s premier multimodal mobility hub, fully integrated with the Downtown Railyards and regional rail network. Phase 1 - Track Relocation was completed in 2013, Phase 2 - Historic Station Renovation was completed in 2017. The City’s 2021 Sacramento Valley Station Area Plan (SVS Area Plan) lays out a transformation that expands rail, bus, pedestrian, and transit-oriented development opportunities as Phase 3 with defined sub-phases. Sacramento Valley Station (SVS) Phase 3.1 is the critical first step to realizing the vision of the SVS Area Plan.

 

Significant portions of this vision are already funded through the Transit and Intercity Rail Capital Program (TIRCP) with the City as lead agency. These Phase 3.1 funded components include: 1) SVS storm drain improvements to facilitate site development; 2) pick-up/drop-off loop to shorten passenger walking distances to transit connections, and 3) enabling work such as removal of historic structures and fiber relocation which overlap within the limits of the 4th component: the relocation of the Sacramento Regional Transit District (SacRT) light rail station. Together, these components prepare the station district for new additional transit service, improved passenger circulation, and future large-scale development.

 

The current light rail station was built in 2005 as a temporary terminal station due to site constraints associated with Union Pacific Railroad ownership and the presence of active mainline tracks. Relocation of the light rail station would support the long-term vision for transit connectivity and planned development within the Railyards district north of Sacramento Valley Station (SVS). The relocation of the station to a through-station would allow the Green Line to serve SVS and connect regional rail, via light rail, to the Railyards and River District. The SCCP grant application seeks $32.5 million to relocate the existing light rail station and complete the originally planned through-station configuration. To align and coordinate the light rail relocation with the design and deadlines of the other already-funded components, Public Works proposes to lead the delivery of the four-component Phase 3.1, with close coordination with SacRT.

 

Caltrans District 3 is nominating the Sacramento Valley Station (SVS) Phase 3.1 Project (Project) as a Priority Tier 1 Project for the application. Project details for the applications are described in the Background section.

End

 

PolicyConsiderations

Policy Considerations: The submission of the project is consistent with the City’s General Plan goals of promoting safety and enhancing livability, sustainability, and economic vitality. In 2021, the City implemented the SVS Area Plan to improve efficiency and expand service opportunities as a regional hub station as designated in the 2018 State Rail Plan and create a destination transit-oriented district for Sacramento. This grant will enable the City to construct a suite of projects at SVS that will implement elements of the SVS Area Plan. 

End

 

EconomicImpacts

Economic Impacts: None.

End

 

EnvironmentalConsiderations

Environmental Considerations:

California Environmental Quality Act (CEQA): Submission of grant applications is not subject to the provisions of CEQA. The components of the Project are consistent with sustainability goals of promoting transit opportunities and Active Transportation options by developing a universally accessible, safe, convenient, integrated, and well-connected transportation system.

End

 

Sustainability

Sustainability: The components of the Project are consistent with the City’s sustainability goals by focusing on improving and optimizing transportation infrastructure and infill transit-oriented development.

End

 

Commission/Committee Action

Commission/Committee Action: None.

End

 

RationaleforRecommendation

Rationale for Recommendation: The City of Sacramento has received $31.3 million in state TIRCP (Transit and Intercity Rail Capital Program) funding to construct several projects to implement the SVS  Area Plan which include 1) the remaining storm drain segment through City property that completes the southern portion of the Railyards Drainage Master Plan; 2) a new Pick-up/Drop-off Plaza which reduces passenger walking distance by 50% from the existing historic station frontage and will reduce the transfer walking distance to/from light rail by 30%; 3) utility relocation and removal of historic station infrastructure. The SCCP grant application seeks $32.5 million towards the 4th component, the relocation of the existing light rail station and complete the originally planned through-station configuration. The current station was built in 2005 as a temporary terminal station due to site constraints associated with Union Pacific Railroad ownership and the presence of active mainline tracks. Relocation of the station would support the long-term vision for transit connectivity and planned development within the Railyards district north of Sacramento Valley Station (SVS). The location of the existing station is a physical barrier to these projects and the future Regional Bus Mobility Hub (RBMH). The RBMH will provide regional and northern California connections to the passenger rail network. The Phase 3.2 RBMH project at 30% design and funded for 100% design completion and has $26.75 million in state TIRCP match toward federal funding. All projects identified are reliant upon the relocation of the light rail station.

End

 

FinancialConsiderations

Financial Considerations: Projects applying for the SCCP do not require a minimum match. The project leverages $31.3 million in committed state funding for SVS which constitutes over 40% of the project funding need. The Sacramento Intermodal Transportation Facility Project (T15029000) has sufficient funding for ineligible costs to support the grant.

 End

 

LocalBusinessEnterprise

Local Business Enterprise (LBE): Not applicable.  

End

 

Background

Background: The Sacramento Valley Station is second only to Los Angeles Union Station for Amtrak ridership in California: it is ranked 15th nationally in the Amtrak system; and is the Capitol Corridor’s highest ridership station with over 741,000 Capital Corridors Joint Powers Authority (CCJPA) passengers passing through the station in FY25. Accounting for all agency services, SVS exceeds 1.2 million passengers annually.

The California State Rail Plan identifies the Sacramento Valley Station (SVS) as Northern California’s primary multimodal transportation hub, providing connections between intercity rail, regional bus services, and local transit networks. Strategically located adjacent to the central business district and within the Downtown Railyards, one of the region’s largest infill development areas, SVS is planned to expand as a comprehensive regional transportation facility.

The planned expansion will accommodate multiple transportation modes, including intercity passenger rail, regional and local bus services, light rail transit, and bicycle and pedestrian connections. Relocation of the existing Sacramento Regional Transit (SacRT) SVS light rail station was first identified in 2004 and has remained a key component of subsequent planning efforts, including the 2021 SVS Area Plan.

The current light rail station configuration physically constrains implementation of the adopted station area plans and places at risk state grant funding awarded to the City for related improvements. Relocating the station and implementing the planned transportation infrastructure will enhance passenger access, reduce transfer distances between transit modes, and facilitate the development of two parcels designated for transit-oriented development that currently serve as stormwater detention basins.

The City has been awarded over $74 million from successive TIRCP grants cycles under a collaborative partnership with Capitol Corridor, JPA (CCJPA) since 2020 through four funding cycles for a suite of projects at SVS property and offsite connectivity projects. 

The 2022 TIRCP Cycle 5 application with CCJPA also included SacRT as an agency partner. The City’s award included full funding for two projects dependent upon the relocation of the SacRT station: 1) the design and construction of the remaining SOTA storm drain segment, the design and, 2) the design and construction of a new Pick-up / Drop-off (PU-DO) plaza situated between the relocated light rail station and the entrance to the Steve Cohn Passageway to the intercity rail passenger platforms. In this cycle, SacRT was allotted $5.14 million for partial funding for the light rail station relocation. The three components are interrelated: the storm drain aligns centers beneath the PU-DO, and under the existing light rail station which is planned for future eastside street access.

 

The light rail project component of Phase 3.1 removes the existing east-west oriented, single-track terminal station and storage tracks and constructs a new center platform, double-track station oriented north-south oriented station platform 120 ft west of 5th Street on the City SVS parcel and will construct double tracks to 7th Street at F Street that will enable the Green Line service to access SVS which will support passenger rail and regional bus transfers to SacRT to the Railyards and high attendance events at the new stadium and entertainment venues, along with service to the River District.

 

Union Pacific Railroad (UPRR) had begun early development plans with Millenia Development in cooperation with the City, SacRT, and CCJPA in anticipation of an eventual sale to the private development company. SacRT had configured the Gold Line in early 2005 between Folsom and Sunrise in Rancho Cordova and anticipated an extension to the Amtrak Station as a through-station loop from H Street, turning north approximately 100 ft west of the proposed 5th Street and continuing east on the proposed F Street to 7th Street where the line would turn north onto 7th Street for eventual extension to the airport. SacRT was able to secure funding from the Federal Transit Administration (FTA) to extend the line, however, UPRR’s mainline tracks had not been relocated at this time and prevented the SacRT station to be built in the desired location. This resulted in a temporary location terminal station which opened in 2006 and has remained to this day. The city acquired the SVS property in 2006 and led the construction to relocate the UPRR mainline tracks and new rail passenger platforms, completed in 2012.

 

Existing agreements between the City and SacRT have remained in anticipation of relocating of the station and the 2021 SVS Area Plan maintained the north/south through line station and is consistent with the Railyards Specific Plans of 2007 and the 2016 updated plan, which includes a drainage line through the city-owned parcel which requires the relocation of the station to implement the remaining segment of the Railyards “South of the Tracks” (SOTA) drainage system and remove the drainage basin functions from two City-owned parcels.

 

In late 2025, SacRT identified funding issues attributed to potential archeological sensitivity on H Street for work to add an addition of a second track west of 7th Street. The timing was such that the agency was unable to retain $25 million awarded in Cycle 3 SCCP funding for the station relocation. The Phase 3.1 project would revise the scope to retain the single track on H Street to the intersection of 5th Street with double track through the new station and continued double track on F Street to 7th Street. This will complete the loop and providing direct service from SVS to the Railyards, River District, and eventually additional points north.

 

The SCCP grant seeks to regain the loss with adjustments for inflationary costs since the original 2022 award. SacRT retains $5.14 million in Cycle 5 TIRCP. Should the City be awarded the SCCP Cycle 5 request, the City MOU would identify these funds to be transferred to the City for the Phase 3.1 project. The City will enter into a Memorandum of Understanding for the light rail component which the City intends to construct as part of a multi-component project.

 

Solutions for Congested Corridors Program (SCCP): Created by the Road Repair and Accountability Act of 2017 (SB 1), the Solutions for Congested Corridors Program is a statewide, competitive program that funds projects to reduce congestion in heavily traveled corridors. Projects must deliver measurable performance improvements that balance mobility, community, and environmental impacts.

Pursuant to Streets and Highways Code Section 2392, the following are eligible to nominate

projects for Solutions for Congested Corridors Program funding:

 

•                     A regional transportation planning agency.

•                     A county transportation commission.

•                     Caltrans.

•                     An authority responsible for preparing a regional transportation improvement program under Government Code Section 14527.

 

The Road Repair and Accountability Act of 2017, or Senate Bill (SB) 1 (Beall, Chapter 5,

Statutes of 2017) established the Solutions for Congested Corridors Program and

continuously appropriates two hundred and fifty million dollars ($250,000,000) each fiscal year

to the Program from the State Highway Account. However, the 2026 Cycle 5 funding capacity is $549,555,000 due to two projects awarded in Cycle 3 were unable to move forward and the forfeited funds made available for the current cycle.

 

Eligible applicants for the SCCP program are limited to Regional Transportation Planning Agencies, County Transportation Authorities, or Caltrans. The City has partnered with Caltrans to apply to the program. Caltrans has an internal nomination process for the SCCP program to ensure that the projects that advance for funding are in alignment with Caltrans and statewide policy goals. The City submitted initial preliminary work in June to Caltrans District 3 for nomination with a project award request of $32.5 million. Caltrans notified the City that the project was approved as a priority Tier 1 for the final SCCP application. The City is advancing work toward the final November 19, 2026 submission to the California Transportation Commission.

End