Legislation Details

File #: 2026-01847    Version: 1
Type: Public Hearing Status: Agenda Ready
File created: 9/30/2026 In control: Planning and Design Commission
On agenda: 10/22/2026 Final action:
Title: Applicant Appeal of Trecinto Project (Z25-091) [Noticed 10/09/2026; Published 10/09/2026]
Attachments: 1. 2026-01847 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Applicant Appeal of Trecinto Project (Z25-091) [Noticed 10/09/2026; Published 10/09/2026]
End

FileID
File ID: 2026-01847
End

Location
Location: 7615 Jacinto Road, APN 117-0202-025-0000, District 8
End

Recommendation
Recommendation: Conduct a public hearing and upon conclusion, pass a Motion to: 1) close the public hearing; and 2) approve: a) Environmental Exemption pursuant to CEQA Guidelines sections 15332, (In-Fill Development); b) Tentative Map to subdivide a ±2.4-acre parcel into 29 parcels within the Single-Unit Dwelling (R-1-R) zone; c) Site Plan and Design Review to review the tentative map layout with deviations to minimum lot width and depth and to construct 29 single-unit dwellings, with deviations to lot size, width, depth, building setback, and lot coverage standards; and d) Tree Permit for the removal of one private protected tree.
End

Contact
Contact: Michael Crampton, Assistant Planner, (916) 808-8951, mcrampton@cityofsacramento.org; Marcus Adams, Senior Planner, (916) 808-5044, madams@cityofsacramento.org; Community Development Department
End

Presenter
Presenter: Michael Crampton, Assistant Planner, (916) 808-8951, mcrampton@cityofsacramento.org, Community Development Department
End

Applicant
Applicant: Andrew MacDonald, Cartwright NorCal, Inc., 3010 Lava Ridge Court, Suite 160, Roseville, CA 95661, (916) 978-4001, andrewm@cartwrightengineers.com
End

Property Owner
Property Owner: Donnie Hanly, NGC Trecinto, LLC., 2339 Gold Meadow Way #205, Gold River, CA 95670, (916) 822-3220, dhanly@nextgenerationcapital.us
End

Attachments
Attachments:
1-Description/Analysis
2-Background
3-Findings of Fact and Conditions of Approval
4-Project Plans
5-Applicant Appeal Letter
6-Applicant Appeal Supplemental
7-Letter of Opposition
8-Historic Evaluation Report
9-Arborist Report
10-Staff Presentation
11-Applicant Presentation
End

Description/Analysis
IssueDetail
Issue Detail: The 2.4-acre Trecinto project site is...

Click here for full text