Title
Fruitridge Road Improvements Project (T15036300)
End
FileID
File ID: 2026-01573
End
Location
Location: Phase 1: Fruitridge Road between 65th Street Expressway and Power Inn Road; Phase 2: Fruitridge Road between 65th Street Expressway and Stockton Boulevard, District 6
End
Recommendation
Recommendation: Review and comment.
End
Contact
Contact: Stephanie Saiz, Assistant Civil Engineer, (916) 808-6808, ssaiz@cityofsacramento.org, Department of Public WorksÂ
End
Presenter
Presenter: Stephanie Saiz, Assistant Civil Engineer, (916) 808-6808, ssaiz@cityofsacramento.org, Department of Public WorksÂ
End
Attachments
Attachments:
1-Description/Analysis
2-Phase 1 Plans
3-Phase 2 Plans
4-Presentation
End
Description/Analysis
IssueDetail
Issue Detail: The Fruitridge Road Improvements Project is divided into two phases to provide flexibility in funding and project delivery. Phase 1 extends along Fruitridge Road between 65th Street Expressway and Power Inn Road. Phase 2 extends between Stockton Boulevard and 65th Street Expressway.
The project is intended to improve safety and mobility for all users, provide more comfortable and connected pedestrian and bicycle facilities, and rehabilitate deteriorated pavement along the corridor. Fruitridge Road currently carries approximately 21,000 vehicles per day and generally consists of four vehicle travel lanes. The corridor serves surrounding neighborhoods, schools, businesses, transit users, pedestrians, and bicyclists.
Existing bicycle facilities along Fruitridge Road are incomplete and consist primarily of disconnected segments of Class II bicycle lanes. Where bicycle lanes are present, both the bicycle lanes and adjacent vehicle travel lanes are narrow and do not meet the City's current minimum design standards.
Safety is also a significant consideration. Earl Warren Elementary School is located adjacent to the project corridor and was evaluated as part of the City's Vision Zero Top 20 Sc...