Title
Establish Capital Improvement Project and Budgetary Adjustments for the Shore Vista Way Overcrossing Traffic Signal Project (T15265300)
End
FileID
File ID: 2026-00381
End
Location
Location: Shore Vista Way/East Commerce Drive across Highway 99 and future development of Meister Way, District 1
End
Recommendation
Recommendation: Adopt a Resolution: 1) establishing Shore Vista Way Overcrossing Traffic Signal Project (T15265300) as a new Capital Improvement Project; and 2) authorizing the City Manager or designee to transfer $640,000 (Greenbriar IA1 PAG, Fund 3352) from available fund balance to the expenditure budget of the Shore Vista Way Overcrossing Traffic Signal Project (T15265300).
End
Contact
Contact: Philip Vulliet, Senior Engineer, (916) 808-5092, pvulliet@cityofsacramento.org; Ofelia Avalos, Engineering Services Manager, (916) 808-5054, oavalos@cityofsacramento.org; Department of Public Works
End
Presenter
Presenter: None
End
Attachments
Attachments:
1-Description/Analysis
2-Resolution
End
Description/Analysis
IssueDetail
Issue Detail: The Greenbriar development is a mixed-use development project that includes: 3,473 low, medium, and high density residential units, 48.4 acres (net) of commercial development, a 10-acre (net) elementary school site, 48.4 acres (net) of neighborhood parks, and a 39-acre (net) lake/detention basin that encircles the central portion of the project site. The project also includes the construction of a new east-west roadway, Shore Vista Way (formerly Meister Way), through the center of the site. The Phase 2 tentative map for the Greenbriar project was approved at City Council on May 21, 2019 and included conditions requiring the construction of a new Shore Vista Way overcrossing of Highway 99 to connect the development with East Commerce Drive to the east.
The new connection includes the extension of Shore Vista Way (also identified as Meister Way) over Highway 99 and terminating to the e...
Click here for full text