Title: [Contract Supplement] Fruitridge Road Improvements Phase 1 (T15036300)
Attachments: 1. 2026-01051 STAFF REPORT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
[Contract Supplement] Fruitridge Road Improvements Phase 1 (T15036300)
End

FileID
File ID: 2026-01051
End

Location
Location: Fruitridge Road, between 65th Street Expressway and Power Inn Road, District 6
End

Recommendation
Recommendation: Pass a Motion: 1) authorizing the City Manager or designee to execute Supplemental Agreement No. 8 to City Agreement No. 2022-0370 with Mark Thomas and Company, Inc. for an amount not-to-exceed $96,713, increasing the total not-to-exceed amount to $829,196; and 2) resetting the City Manager's and designee's authority to issue supplemental agreements for City Agreement No. 2022-0370.
End

Contact
Contact: Stephanie Saiz, Assistant Civil Engineer, (916) 808-6808, ssaiz@cityofsacramento.org; Jesse Gothan, Supervising Engineer, (916) 808-6897, jgothan@cityofsacramento.org; Ofelia Avalos, Engineering Services Division Manager, (916) 808-5054, oavalos@cityofsacramento.org; Department of Public Works
End

Presenter
Presenter: None
End

Attachments
Attachments:
1-Description/Analysis
2-Supplement Agreement
End

Description/Analysis
IssueDetail
Issue Detail: The Fruitridge Road Improvements Project is made up of two phases: 1) Phase 1 is located on Fruitridge Road between 65th Street Expressway and Power Inn Road; and 2) Phase 2 is located between Stockton Boulevard and 65th Street Expressway. The purpose of the Fruitridge Road Improvements Project is to calm traffic, improve mobility options for bicyclists and pedestrians, and bring the pavement to a condition of good repair.

Fruitridge Road carries approximately 21,000 cars per day on four vehicle lanes. The roadway serves neighborhoods, schools, and businesses; however, existing bicycling infrastructure does not support access to these services. The corridor includes disconnected segments of Class II bike lanes, and where bike lanes are present, both the bike lanes and vehicle travel lanes are narrow and do not meet Sacramento's current minimum s...