Skip to main content
City of Sacramento header
File #: 2019-00563    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 4/5/2019 In control: City Council - 5PM
On agenda: 5/14/2019 Final action: 12/31/2023
Title: Appropriate Funding to 4th R Deferred Maintenance Program
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title:

Title

Appropriate Funding to 4th R Deferred Maintenance Program

End

 

FileID

File ID:  2019-00563

 

Location

Location: Citywide

 

Recommendation:

Recommendation

Adopt a Resolution appropriating $350,000 from the 4th ‘R’ (fund 6012) available fund balance to the 4th ‘R’ Deferred Maintenance Program (L19803500).

 

Contact: Katie Houser, Recreation General Supervisor, (916) 808-6046, Department of Youth, Parks, & Community Enrichment

 

Body

Presenter: None

 

Attachments:

1-Description/Analysis

2-Resolution

 

 

Description/Analysis

 

Issue Detail: The 4th “R” child care program, operated by the Department of Youth, Parks, & Community Enrichment, has provided a high quality and valuable service since 1981. Child care services are provided before, during, and after school hours throughout the year. The program serves more than 2,000 children each year at 19 elementary school campuses.

 

The 4th “R” child care program uses several portables for each site, of which 26 buildings are city-owned.  In past years, the maintenance of the city portables has come out of the 4th “R” operating budget. In 2018, the 4th “R” Deferred Maintenance Program Capital Improvement Project (CIP) was established to begin work on needed repairs to these city portables.

 

The following sites have been assessed by staff to identify needed and preventative maintenance repairs:

 

Site

Repair

Hollywood Park

 

 

Surrounding pathway needs to be taken out and repaved, exterior paint and new shed.

Bancroft

 

Building 1

Resurface two ramps. Replace broken cabinets/shelving. 

Building 2

Resurface and repair ramp and back porch area.  Replace broken cabinets/shelving.

 

Repair or replace shed door siding.

Caleb Greenwood

 

 

Interior Wall Repairs, redo flooring.

Didion

 

 

Repair floor tile, repaint exterior of three portables, replace ripped screens on windows.

Phoebe Hearst

 

 

Outdoor storage space.

Pony Express

 

 

Repair dry rot on building, resurface ramp/stairs.

Two Rivers

 

 

Replace flooring in bathroom and main area, resurface ramp, repair/replace wall paper

Witter Ranch

 

 

Repaint exterior of portable, repair dry rot around windows

Natomas Park

 

 

Permanent shade structure for front of building, metal window covering for windows facing playground, replace gutters.

 

Policy Considerations: As stated in the Budget Resolution No. 2018-0235, Section 6.3, City Council approval is required to make appropriations exceeding $100,000 from available fund balance.

 

Economic Impacts:  Not Applicable

 

Environmental Considerations: These maintenance projects are exempt from environmental review under CEQA Guidelines section 15301, existing facilities.  

 

Sustainability: Not Applicable

 

Commission/Committee Action: Not Applicable

 

Rationale for Recommendation: The 4th “R” child care program is an essential program for the City and its residents. Funding for the CIP is needed so that these buildings can be regularly maintained to provide suitable facilities for children and employees, provide for the well-being of the program, insure compliance with state licensing requirements, and extend the life of these modular buildings.

 

Financial Considerations: There are sufficient resources in the 4th “R” (Fund 6012) available fund balance to appropriate funding for the 4th “R” Deferred Maintenance Program (L19803500) in the amount of $350,000. No General Fund dollars are used in the delivery or administration of the program.

 

Local Business Enterprise (LBE): Not Applicable