Title:
Title
Supplemental Agreement: Reservoir Concrete Repair Service
End
FileID
File ID: 2020-01038
Location
Location: Citywide
End
Recommendation:
Recommendation
Pass a Motion authorizing the City Manager or the City Manager's designee to execute Supplemental Agreement No. 1 to City Agreement PRC001042 with DN Tanks to complete additional permanent spot repairs for the Reservoir Concrete Repair Project, for an amount not-to-exceed $226,200, bringing the agreement's total not-to-exceed amount to $436,200.
FileName
Contact: Colleen Karbowski, Project Manager, (916) 808-1474; Michelle Carrey, Supervising Engineer (916) 808-1438; Pravani Vandeyar, Water Division Manager, (916) 808-3765; Tony Bertrand, Engineering & Water Resources Division Manager, (916) 808-1461; Department of Utilities
Body
Presenter: None
Attachments:
1-Description/Analysis
2-Supplemental Agreement
Description/Analysis
Issue Detail: The City of Sacramento (City) owns and operates 12 water reservoirs throughout the City. These reservoirs help to maintain pressure throughout the City's water distribution system and provide emergency storage for fire protection. Three of these reservoirs, UCD Medical Center, Alhambra, and City College Reservoirs, are elevated reinforced concrete structures which house and support steel lined tanks. They were constructed between 1934 and 1938. City staff performed exterior surface inspections of the reservoirs in 2019, which was prompted by evidence of exterior concrete failures at UCD Medical Center Reservoir. Staff observed several locations of concrete delamination and spalling along the exterior surfaces of all three reservoirs. Due to the amount of spot repair locations identified during the first portion of work, only UCD Medical Center Reservoir repair work and inspections at Alhambra Reservoir were completed under the original contract amount.
Additional services are needed to perform the permanent repair of the exterior surface of...