City of Sacramento header
File #: 2019-00311    Version: 1 Name:
Type: Consent Item Status: Agenda Ready
File created: 2/22/2019 In control: City Council - 5PM
On agenda: 4/2/2019 Final action:
Title: Preliminary Design and EIR Addendum for Sacramento River Parkway - Central Pocket Levee Trail Project (K15185000)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title:
Title
Preliminary Design and EIR Addendum for Sacramento River Parkway - Central Pocket Levee Trail Project (K15185000)
End

FileID
File ID: 2019-00311

Location
Location: Pocket Area Levee, District 7

Recommendation:
Recommendation
1) Adopt a Resolution approving the preliminary design plan for the Sacramento River Parkway - Central Pocket Levee Trail Project (K15185000); and 2) adopt a Resolution approving the Addendum to the Sacramento River Parkway Environmental Impact Report (EIR) for the Project.

Contact: Adam Randolph, Senior Engineer (916) 808-7803; Nader Kamal, Interim Engineering Services Manager (916) 808-7035, Department of Public Works

Body
Presenter: None

Attachments:
1-Description/Analysis
2-Resolution (Approving Preliminary Plan)
3-Preliminary Plan
4-Resolution (Adopt Addendum)
5-Resolution No. 1997-590
6-Exhibit A - Addendum to the Sacramento River Parkway Plan EIR
7-Exhbit B - Initial Study for the Sacramento River Parkway Central Pocket Levee Trail



Description/Analysis

Issue Detail: In 1975, the City Council took the first formal action to recognize the need for providing recreational use along the Sacramento Riverfront by adopting a Feasibility Study and Sacramento River Parkway Master Plan (1975 Plan). The 1975 Plan introduced the concept of developing a public access recreation trail along the Sacramento River, coupled with natural resource protection and enhancement.

In 1997, an update to the Sacramento River Parkway Plan was adopted by passage of Resolutions 1997-590 through 594. These actions updated the Sacramento River Parkway Plan and the City/County Bikeway Master Plan was amended to include the proposed off-street multi-use trail along the Sacramento River. The 1997 Sacramento River Parkway Plan retained the core values of the 1975 Plan and added guiding policies that addressed security, privacy and design issues. The 1997 Plan included a map showing proposed off-street segments where they did not current...

Click here for full text