Title:
Title
Plans and Specifications and Contract: Fire Station 8 Roof Replacement Project (C13900000)
End
FileID
File ID: 2019-01020
Location
Location: 5990 H Street, District 3
Recommendation:
Recommendation
Pass a Motion: 1) approving the construction plans and specifications for the Fire Station 8 Roof Replacement Project; 2) awarding a construction contract to Madsen Roofing and Waterproofing, Inc., in an amount not to exceed $119,493 for the Fire Station 8 Roof Replacement Project; and 3) authorizing the City Manager or the City Manager's designee to execute the contract specified above.
Contact: Norm Colby, Facilities & Real Property Superintendent, (916) 808-8335; James Christensen, Facilities Manager, (916) 808-5863, Department of Public Works
Body
Presenter: None.
Attachments:
1-Description/Analysis
2-Contract
Description/Analysis
Issue Detail: The existing three roof sections at Fire Station 8 are nearing the end of their useful life and need to be replaced. The recommended contract with Madsen Roofing and Waterproofing, Inc. will include removal and replacement of one existing asphalt built-up roof section and the re-roof of two other existing asphalt built up roof sections. The new roof sections will correct drainage issues that currently exist on the roof sections.
Policy Considerations: The recommendations in this report are in accordance with the provisions of City Code Chapter 3.60.
Economic Impacts: The recommended contract is expected to create 0.48 jobs (0.27 direct jobs and 0.20 jobs through indirect and induced activities) and create $73,779 in total economic output ($46,503 of direct output and another $27,276 of output in indirect and induced activities).
The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical...
Click here for full text