Title: Plans and Specifications and Contract: Fire Station 6 Roof Replacement Project (C13900000)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title:
Title
Plans and Specifications and Contract: Fire Station 6 Roof Replacement Project (C13900000)
End

FileID
File ID: 2019-01021

Location
Location: 3301 Martin Luther King Blvd, District 5

Recommendation:
Recommendation
Pass a Motion: 1) approving the construction plans and specifications for the Fire Station 6 Roof Replacement Project; 2) awarding a construction contract to Commercial Waterproofing, Inc., in an amount not to exceed $150,496 for the Fire Station 6 Roof Replacement Project; and 3) authorizing the City Manager or the City Manager's designee to execute the contract specified above.

Contact: Norm Colby, Facilities & Real Property Superintendent, (916) 808-8335; James Christensen, Facilities Manager, (916) 808-5863, Department of Public Works

Body
Presenter: None

Attachments:
1-Description/Analysis
2-Contract



Description/Analysis

Issue Detail: The existing roof of Fire Station 6 is beyond its useful life and needs to be replaced. The recommended contract with Commercial Waterproofing, Inc. will include removal of existing concrete tiles and replace with new Owens Corning Cool shingles, and the replacement of the asphalt built-up roofing with a TREMCO Thermoplastic, Tri-Polymer Alloy Single Ply Roof (TPA) membrane system. The new roof sections will include new flashing metal and will correct drainage issues.

Policy Considerations: The recommendations in this report are in accordance with the provisions of City Code Chapter 3.60.

Economic Impacts: The recommended contract is expected to create 0.60 jobs (0.35 direct jobs and 0.25 jobs through indirect and induced activities) and create $92,922 in total economic output ($58,569 of direct output and another $34,353 of output in indirect and induced activities).

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to qua...