Title: Contract: Hart Senior Center Remodel and Facility Improvement (L19800200)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title:
Title
Contract: Hart Senior Center Remodel and Facility Improvement (L19800200)
End

FileID
File ID: 2020-00309

Location
Location: 915 27th Street, 95816, District 4

Recommendation:
Recommendation
Pass a Motion: 1) approving the construction plans and specifications for the Hart Senior Center Remodel and Facility Improvement Project (L19800200); 2) awarding the construction contract to one of the City's on-call general contractors, CCCS, Inc., for an amount not to exceed $320,821; and 3) authorizing the City Manager or the City Manager's designee to execute the contract specified above.

Contact: Ezra Roati, Associate Architect, (916) 808-5877; Mark C. Brown, Supervising Engineer, (916) 808-7118, Department of Public Works

Body
Presenter: None

Attachments:
1-Description/Analysis
2-Contract



Description/Analysis

Issue Detail: The Ethel Macleod Hart Senior Center (Hart Senior Center) was originally constructed in 1961 as the Sacramento Senior Center by the City of Sacramento to serve older adults. In 1991, the building was remodeled and expanded to include a large multi-purpose room. In 1995, it was renamed after Ethel Macleod Hart. In 2006, a small office expansion was constructed on the south end of the facility. The facility is now in need of additional renovations to allow for improved use and functioning of the Hart Senior Center.

The project proposed in this staff report would remodel the existing space in two phases to maximize the use of the facility. Phase one will include demolition of existing finishes, investigation of settling concrete flooring including waterproofing/stabilization, and replacement of flooring and wall finishes. Phase two includes demolition of the front counter and replacement of the public counter and finishes. All finishes tested came back from the material testing lab with "non-detect" for lead and asbestos, so there is no abatement work as part of this project, but all demolition materials will be tested...